background image

1315 Storm Parkway, Torrance, CA 90501

   

|

   

P 800.421.5830

   

|

   

www.mkdiamond.com

   

|

   

F 310.539.5158

Step (6) Pre-set your hood by closing the two zippers creating 

the hood shape. Make sure the Velcro, at the base, is on the 

outside. This Velcro will later attach to the Velcro that is sewn 

on the inside of the black pan. Grab the hood and approach the 

Saw Tent from the rear of the unit. Envelope the tubular frame 

structure with the clear plastic hood and make it tight. Now come 

around to the front and attach the Velcro strap to the front cross 

member in the middle. Next, work the plastic sheeting around 

the frame, leaving the perimeter, with the Velcro outside of the 

black pan. After you have attached all other Velcro pieces to the 

aluminum frame, work your way around the perimeter pushing 

the clear plastic sheeting (with the Velcro attached) to the inside 

of the black pan. As you work your way around, you will be join-

ing the two horizontal strips of Velcro together. What this does is 

make sure the water spray will run down the vertical walls and 

drip inside the pan, thus containing the water. Use the handy 

plug opening in the back. 

Step (5) Install top supports as shown in the drawing, one in the 

back, middle, and the third against the 45 degree elbow. These 

three supports help keep the plastic enclosure away from the 

saw and bring strength to the whole structure.

Storing

Reverse these instructions to take the Saw Tent apart. After you remove the saw and stand, use a 

sponge to remove any water that has accumulated from use. Take care to clean all parts and roll up 

the Saw Tent, put it into the storage case, and it will be ready to use on the next job. 

SAW ASSEMBLY INSTRUCTIONS

© 2012 MK Diamond Products, Inc. All Rights Reserved. Images and specifications are subject to change without notice. Saw Assembly Instruction Sheet Part # 169658-IS (07/12)

Отзывы: