MJM International Corporation
"We Do Care - We Do More"
323 East Owassa • Suite 4 • Edinburg, TX 78539 • 1-800-270-6199 • 956-781-5000 • Fax 956-781-5552
www.mjminternational.com • [email protected]
IDENTIFY COMPONENTS TO START ASSEMBLY
NOTE: A PHILLIPS SCREWDRIVER OR A CORDLESS HAND DRILL IS REQUIRED TO TIGHTEN/SECURE ALL SCREWS.
STEP 2 – REMOVING DRAIN PAN & HOSE.
STEP 1 CASTERS.
STEP 2 BACKREST.
INSERT ARMREST INTO SEAT SECTION.
SECURE USING ½’’ RETAINING SCREWS. USING PILOT
HOLES AS REFERENCE.
STEP 3 ARMS.
INSERT RECLINING BACKREST.
SECURE USING ½’’ RETAINING SCREWS. USING PILOT
HOLES AS REFERENCE.
INSERT CASTER LEG STEMS INTO BASE SECTION.
DRILL THROUGH LEG PIPES USING 1/8 DRILL BIT AND
PILOT HOLES AS REFERENCE.
SECURE CASTERS USING ½’’ RETAINING SCREWS.
SEAT SECTION.
ELEVATED LEGREST WITH CUSHION
RECLINING BACKREST WITH CUSHION
ARMS.
PUSH PULL HANDLE
COMMODE
SLIDING FOOTREST
MESH SLING WITH PAD
16 (SIXTEEN) ½’’ SCREWS.
BOX WITH CASTERS AND SCREWS
o
2 CASTERS WITH BRAKES.
o
3 CASTERS NON BRAKE.
STEP 4 PUSH-PULL HANDLE.
INSERT PUSH PULL HANDLE INTO BACK SECTION
196-26-BAR – 196-30-BAR
Assembly Instructions