Max. 12 minutes and 50 seconds
Defrost operation
Heating operation
※
Depends on an operation condition, the time can be longer than 7 minutes.
2~7 minutes
※
Hot keep operation
-20
-20
-15
-10
-5
0
5
10
-15
-10
-5
0
Outdoor air temperature (
℃
)
Outdoor heat e
xc
hang
er temperature (
℃
)
Defrost operation
start
Defrost operation start temperature
−
−
(i)
(ii)
(iii)
Tho-R
Tho-R
Tho-R
minutes
2
2
20
º
(v)
(i) (ii) (iii)
(v)
(b) Ending conditions
Max. 12 minutes and 50 seconds
Defrost operation
Heating operation
※
Depends on an operation condition, the time can be longer than 7 minutes.
2~7 minutes
※
Hot keep operation
-20
-20
-15
-10
-5
0
5
10
-15
-10
-5
0
Outdoor air temperature (
℃
)
Outdoor heat e
xc
hang
er temperature (
℃
)
Defrost operation
start
Defrost operation start temperature
(a) Capacity control
(i) Indoor unit SRK
**
ZMX-S models only
Model
Capacity
SCM40ZS-S
̾
SCM45ZS-S
̾
SCM50ZS-S
̾
Capacity control is within the range shown above. If demand capacity of the indoor units exceeds the maximum capacity
of the outdoor unit, the demand capacity will be proportionally distributed.
Model
Capacity
SCM40ZS-S
̾
SCM45ZS-S
̾
SCM50ZS-S
̾
SCM50ZS-S
1.8
—
6.9 kW
Model
Capacity
SCM40ZS-S
1.5
—
5.8 kW
SCM45ZS-S
1.5
—
6.3 kW
(ii) Indoor unit except SRK
**
ZMX-S and SKM
**
ZSP-S models
(ii) Indoor unit SKM
**
ZSP-S models only
7.5.2 Outline of cooling operation
(1) Summary
-
190
-
'16 • SCM-T-199
Содержание SCM40ZS-S
Страница 114: ...113 16 SCM T 199 source PJA012D783...
Страница 200: ...199 16 SCM T 199 4 Troubleshooting procedure If the air conditioner runs NO NO NO NO YES YES YES YES 200 201 207 201 207...
Страница 285: ...284 16 SCM T 199 B PJZ012D077 2 Model RC EX1A eco touch REMOTE CONTROL RC EX1A INSTALLATION MANUAL...
Страница 311: ...310 16 SCM T 199 4 10 5 Superlink E board SC ADNA E F SL2NA E and SL4 AE BE to control...
Страница 312: ...311 16 SCM T 199...