73
OPERATING PROCEDURE
PHOTOS
5. Removing the reactor
(1)Remove the top panel (Photo 1).
(2)Remove the service panel, cabinet, back panel and the relay
panel.
(3)Disconnect the reactor lead wire from the terminal of the
reactor.
(4)Remove the screws of the reactor, and remove the reactor
(Photo 9).
Photo 9
Screws of the reactor
3. Removing the 4-way valve
(1)Remove the top panel (Photo 1).
(2)Remove the service panel, the cabinet and the back panel
(Photo 1, 2, 3).
Recover refrigerant gas.
(3)Remove the electrical parts (Photo 4).
(4)Detach the welded parts of 4-way valve and pipe.
4. Removing the expansion valve
(1)Remove the top panel (Photo 1).
(2)Remove the service panel, the cabinet and the back panel
(Photo 1, 2, 3).
(Gas recovery is not required if the unit is pumped down.)
(3)Remove the cabinet for removing LEV E (Photo 1, 2, 5).
(4)Remove the electrical parts for removing LEV E (Photo 4, 5).
(5)Remove the LEV coils.
(6)Detach the welded parts of expansion valves and pipes.
4-way valve
R.V. coil
LEV coils
Expansion
valves
Photo 7
Photo 8
Welded parts
OB444C--3.qxp 07.10.18 8:50 PM Page 73
Содержание MXZ-2A20NA
Страница 25: ...25 WIRING DIAGRAM 6 MXZ 2A20NA...
Страница 26: ...26 MXZ 2A20NA 1...
Страница 27: ...27 MXZ 3A30NA...
Страница 28: ...28 MXZ 3A30NA 1...
Страница 101: ...101...