- 3 -
CONTENTS
3-2-1 GUIDE ROLLER Adjustment Check ............31
3-2-2 Height Adjustment of
GUIDE ROLLER (SP) ..................................31
3-2-3 Height Adjustment of
GUIDE ROLLER (TU) ..................................31
3-2-4 Coarse Adjustment of Phase .......................32
3-2-5 Flatness Check of FM Waveform.................32
3-2-6 Tape Running Condition
at the GUIDE ROLLERs (Check1) ...............33
3-2-7 Tape Running Condition
at the GUIDE ROLLERs (Check 2) ..............33
3-3
A/C HEAD Adjustment .................................34
3-3-1 Slant Adjustment of A/C HEAD ....................34
3-3-2 Azimuth and Height Adjustment of
A/C HEAD ....................................................34
3-4
Phase Adjustment ........................................35
3-5
Tape wrinkle check ......................................35
4.
Servicing for Tape Jam
during the Loading Process .........................36
SERVICE CAN BE EXECUTED
WITH THE EE PICTURE DISPLAYED........................37
DECK OPERATION CHECK .........................................37
– FILE “PARTSLST” –
PARTS LIST ....................................................................1
1.
CABINET ASSEMBLY........................................1
2.
PACKING PARTS...............................................3
3.
ELECTRICAL PARTS.........................................5
– FILE “DECKASSY” –
DECK ASSEMBLY-1........................................................1
DECK ASSEMBLY-1 P/L ................................................2
DECK ASSEMBLY-2........................................................4
DECK ASSEMBLY-2 P/L ................................................5
– FILE “SCHEMATC” –
BLOCK DIAGRAMS
SCHEMATIC DIAGRAMS
PRINTED CIRCUIT BOARDS PARTS LAYOUT
Содержание HS-U778
Страница 53: ... 1 PARTS LIST 1 CABINET ASSEMBLY r w 1 2 1 8 3 6 7 t 0 9 3 ...
Страница 55: ... 3 1 2 2 4 4 9 8 6 5 4 3 2 7 A 1 B 3 2 PACKING PARTS ACCESSORY A B ...
Страница 57: ...DECK ASSEMBLY ...