11. CC-Link IE FIELD NETWORK CONNECTION
11.4 PLC Side Setting
11 - 11
C
C
-Link IE FIELD NETWORK CONNECTION
11
11.4 PLC Side Setting
This section describes the settings of the GOT and CC-
Link IE controller network module in the following case of
system configuration.
POINT
POINT
POINT
CC-Link IE Field Network Module
For details of the CC-Link IE Field Network module,
refer to the following manual.
CC-Link IE Field Network Master/Local Module
User's Manual
System configuration
(Network Type: CC IE Field)
*1
The CC-Link IE Field Network module is mounted on slot 0
of the base unit.
The start I/O No. of the CC-Link IE Field Network module is
set at [0].
POINT
POINT
POINT
When connecting to Q170MCPU or Q170MSCPU(-S1)
When connected to Q170MCPU or Q170MSCPU(-
S1), the start I/O No. of the CC-Link IE Field Network
communication unit is set to "70".
Parameter settings (Connection to MELSEC-
Q, QS series) of System configuration
(Network Type: CC IE Field)
(1) Network parameter] of GX Works2
Use GX Works2 of Version 1.31H or later.
(a) Network parameter
: Necessary
: As necessary
: Not necessary
*1
When using Q170MCPU or Q170MSCPU(-S1), set it
according to the system configuration.
*2
Specify the same network No. as that of the GOT.
*3
Set the same mode setting as that of the GOT.
<CC-Link IE Field Network module> *
1
(Use the default value for settings other than the following.)
Station No.
: 0 (fixed)
Mode
: Online (normal)
Network type
: CC IE Field (Master station)
Network No.
: 1
Total stations
: 1
Network Configuration Settings :
CC-Link IE Field Network
<GOT>
(Use the default value for settings other
than the following.)
RX/RY00
H
to FFH
RW
W/
RW
r
00
H
to FFH
Network type
: CC IE Field
Network No.
: 1
Station No.
: 1
Mode Setting : Online
Network Configuration Settings :
Monitor Speed : High
RX/RY00 to FFH
RW
W/
RW
r
00 to FFH
■
GT Designer3 [Communication setting] of System
configuration1 (Network Type: CC IE Field)
■
[Network parameter] of GX Works2
Item
Set value
Setting
necessity at
GOT
connection
Network type
CC IE Field
(Master station) (fixed)
Starting I/O No.
*1
0000
H
Network No.
*2
1
Total stations
1
Station No.
0 (fixed)
Mode
*3
Online
(Normal mode)
Network Configuration
Settings
Refer to (b)
Refresh parameters
(Use default value)
Interrupt settings
Interlink transmission
parameters
Routing parameters
Refer to (c)
Содержание GOT2000 Series
Страница 2: ......
Страница 62: ...1 38 1 PREPARATORY PROCEDURES FOR MONITORING 1 6 Checking for Normal Monitoring ...
Страница 64: ......
Страница 80: ...2 16 2 DEVICE RANGE THAT CAN BE SET 2 6 MELSEC WS ...
Страница 246: ...7 26 7 COMPUTER LINK CONNECTION 7 6 Precautions ...
Страница 252: ...8 6 8 BUS CONNECTION 8 1 Connectable Model List ...
Страница 256: ...8 10 8 BUS CONNECTION 8 2 System Configuration ...
Страница 288: ...8 42 8 BUS CONNECTION 8 4 Precautions ...
Страница 324: ...9 36 9 MELSECNET H CONNECTION PLC TO PLC NETWORK MELSECNET 10 CONNECTION PLC TO PLC NETWORK ...
Страница 416: ......
Страница 510: ...15 46 15 SERVO AMPLIFIER CONNECTION 15 7 Precautions ...
Страница 518: ...16 8 16 ROBOT CONTROLLER CONNECTION 16 6 Precautions ...
Страница 540: ...17 22 17 CNC CONNECTION 17 7 Precautions ...
Страница 541: ...MULTIPLE GOT CONNECTIONS 18 GOT MULTI DROP CONNECTION 18 1 ...
Страница 542: ......
Страница 567: ...MULTI CHANNEL FUNCTION 19 MULTI CHANNEL FUNCTION 19 1 ...
Страница 568: ......
Страница 592: ...19 24 19 MULTI CHANNEL FUNCTION 19 3 GOT Side Settings Example Setting example for Ethernet connection 4 channels ...
Страница 599: ...FA TRANSPARENT FUNCTION 20 FA TRANSPARENT FUNCTION 20 1 ...
Страница 600: ......
Страница 668: ...20 68 20 FA TRANSPARENT FUNCTION 20 7 Precautions ...
Страница 670: ...REVISIONS 2 ...
Страница 673: ......