background image

HEAD OFFICE

: MITSUBISHI DENKI BLDG MARUNOUTI TOKYO 100-8310

TELEX : J24532 CABLE MELCO TOKYO

HIMEJI WORKS : 840, CHIYODA CHO, HIMEJI, JAPAN

2.2 Power Supply Specifications

2.3 Screen Hardware Specifications

3. Installation

Note;

Do not mount the GOT in an environment that contains dust, soot corrosive or conducive
dust, corrosive or flammable gas, or expose the unit to high temperatures, dew
condensation, rain and wind or impact and vibration.
If the GOT is used in such a place, electrical shock, fire, malfunction, damages or
deterioration may be caused.

Never drop cutting chips or electric wire chips into the ventilation window of the GOT
when drilling screw holes or performing wiring. Such chips may cause fire, failure or
malfunction.

Make sure that the power is turned off, before securely connecting any cables. Poor
connection may cause malfunction.

The GOT is designed to be mounted in a panel. Install it using the following procedure.

1) Preparing the panel surface. 

On the panel surface, cut a rectangular mounting slot of the
dimensions shown on the right.
At this time, space of 10 mm is required at each of the top and the
bottom of the slot, inside the panel for metal fixtures as shown in
“4) Dimensions required inside the panel for installation”.

Note

Make sure that the thickness of the panel surface is no more than 5 mm (0.20").

Items

Specifications

Power Supply Voltage

24V DC, +10% -15%

Power Supply Ripple

200 mV or less

Current Consumption

Ratings: 650 mA at 24V DC
750 mA at 24V DC or less when power supply is turned ON
400 mA at 24 V DC when backlight is turned OFF

Fuse

Fuse built-in GOT (impossible to change)

Max. Allowable Momentary 
Power Supply Failure period

1 ms; If less than 1 ms, the GOT will continue operation. If 1 ms or 
more, the GOT will shut down.

Battery

Built-in, PM-20BL type lithium battery. (Approximately 5 years life)
Guaranteed term is 1 year. 

Items

Specifications

Display Device

TFT color liquid crystal

Resolution

480 

×

 234 (dot), 60 characters 

×

 14 lines

Dot Pitch

0.324 mm (0.013") Horizontal 

×

 0.375 mm (0.015") Vertical.

[Actual character size ratio 1:1.16] 

Effective Display Size

155.5 mm (6.12") 

×

 87.8 mm (3.46"); 7 (inch) type

Number of Colors

256 colors

Life of liquid crystal

50,000 hours or more 
(Operating temperature: 25 

°

C / 77

°

F)

Guaranteed term is 1 year. 

Backlight

Cold cathode tube

Life of Backlight

50,000 hours or more 
(Operating temperature: 25 

°

C / 77

°

F)

Guaranteed term is 1 year. 

Touch Keys

Maximum 50 touch keys / screen, 30 

×

 12 matrix

Interface

COM0

Conforming to RS-422

COM1

Conforming to RS-232C

COM2

Conforming to RS-232C

Number of Screens

User screen: 500 screens or less
System screen: Allocated screens No. 1001-1030.

User Memory

Flash memory 1MB (built-in)

S l o t   t o   b e   c u t   o n   p a n e l

2 0 6 ( 8 . 1 1 " )

+ 1 ( + 0 . 0 4 " )

  0

U n i t :   m m ( i n c h e s )

12

4(4

.8

8"

)

+1

(+

0.

04"

)

 0

2) Inserting the GOT into the panel surface

Attach the packing seal to the GOT, and insert the GOT from
the front face of the panel surface.

a) Packing seal

b) GOT

c)

Mounting slot

3) Fixing the GOT

Put hooks of the mounting brackets (supplied) in to the
mounting holes in the GOT. Tighten mounting bolts (also
supplied) until the GOT is securely fixed.
Fix mounting bolts in all four positions, above and below the
GOT.

a) Clamping bolt

b) Mounting bracket

Note:

Make sure to tighten the clamping bolts with a torque of 0.3 ~ 0.5 N

    

m.

4) Dimensions required inside the panel

for installation.
When installing the GOT, make sure
that the inside dimensions shown on
the right are available.

a) PLC connection cable

b) Packing seal

4. Wiring for Power Supply

Caution:

Cut OFF all phases of power source externally, before installation or wiring work in order to
avoid electric shock or damage to the product.

Note:

When wiring the power supply, use electric wires of 0.75 mm

2

 or more so that voltage

drop will not occur. For crimp-style terminals, use M3 size. Securely tighten crimp-style
terminals with a torque of 0.5 ~ 0.8 N

 

m so that errors will not occur.

Insure correct termination of DC power source, incorrect connection may result in unit
failure or the GOT being burnt.

Attach a fuse of 2 A to the 24V DC power supply. 

Perform Class D (100

Ω 

or less) grounding with an electric wire of at least 1.25 mm

2

.

Never perform common grounding of the GOT and a strong power system.

Note

Feed power to the GOT by an external power supply. 
(The service power supply of the programmable controller cannot be used.)

Even if instantaneous power interruption of less than 1 ms occurs, the GOT continues its
operation. When power interruption for considerable period of time or voltage drop occurs,
the GOT stops its operation. However, when the power supply is recovered, the GOT
automatically restar ts its operation. (The screen displayed just after recovery is
determined by the working environment originally set.)

b )

a )

c )

b )

a )

5 ( 0 . 2 0 " )   o r   l e s s

7 0 . 6 ( 2 . 7 8

"

)

b )

2 2 5 ( 8 . 8 6 " )

14

3(

5.

63

")

a )

PLC

GOT

24V DC

Fuse (2A)

24V DC external
power supply

Grounding registance
100

 or less (class D)

5. Expansion Module (F9GT-40FMB)

F9GT-40FMB has a built-in flash memory and can transfer screen data when installed in the GOT. 
(When installed in the OS earlier than version 1.40, screen display is not available while transferring data
from F9GT-40FMB to the GOT.)
For the use methods and specifications, refer to the manual for F9GT-40FMB. 

6. Maintenance

Cautions:

Correctly connect the battery for memory backup. Never charge, disassemble, heat, burn
or short-circuit the battery. If the battery is handled in such a way, bursting or fire may be
caused.

Always power OFF and remove the GOT from the panel before starting replacement of
the battery. If this is not the case, electrical shock may be sustained.

Never disassemble or modify the GOT. Disassembly or modification may cause failure,
malfunction or fire. For repair, please, contact a service representative.

Note:

Make sure to turn off the power, before connecting/disconnecting cables.
If you connect/disconnect cables while the power is turned on, failure or malfunction may be
caused.

When repairing backlight and liquid crystal screen, please, contact a service representative.

6.1 Replacement of Battery

When the battery voltage drops, a control device (system information) set by the screen design software
turns ON. The control device interlocks with an auxiliary relay in the PLC. It is recommended to provide a
lamp while utilizing the output of the PLC so that voltage drop can be monitored outside the GOT.
For details of control devices, refer to the GOT-F900 Series Operation Manual.

Note:

For approximately one month after the control device (system information) for battery voltage
drop turns ON, the battery backs up the alarm history, sampling and the current time. When
the control device turns ON, replace the battery (PM-20BL) soon.
The screen data is stored in the flash memory. Even if the battery is totally worn out, the screen
data remains stored

6.1.1 Replacement Procedure

1) Turn off the power to the GOT and remove the battery holder

cover.

2) Remove the existing battery from the battery holder, and

disconnect.

3) Within 30 seconds, connect a new battery.

4) Insert the new battery into the battery holder, and attach the

cover.

P M - 2 0 B L

Manual number : JY992D93901

Manual revision : C

Date

: September 2001

Содержание F940WGOT-TWD

Страница 1: ...ammable controller CPU is interrupted and it is impossible to operate switches or devices in the PLC through the GOT Communication and operation resumes when the GOT system is correctly configured DO...

Страница 2: ...ammable controller CPU is interrupted and it is impossible to operate switches or devices in the PLC through the GOT Communication and operation resumes when the GOT system is correctly configured DO...

Страница 3: ...ammable controller CPU is interrupted and it is impossible to operate switches or devices in the PLC through the GOT Communication and operation resumes when the GOT system is correctly configured DO...

Страница 4: ...4 Wiring for Power Supply Caution Cut OFF all phases of power source externally before installation or wiring work in order to avoid electric shock or damage to the product Note When wiring the power...

Страница 5: ...4 Wiring for Power Supply Caution Cut OFF all phases of power source externally before installation or wiring work in order to avoid electric shock or damage to the product Note When wiring the power...

Страница 6: ...4 Wiring for Power Supply Caution Cut OFF all phases of power source externally before installation or wiring work in order to avoid electric shock or damage to the product Note When wiring the power...

Страница 7: ...ammable controller CPU is interrupted and it is impossible to operate switches or devices in the PLC through the GOT Communication and operation resumes when the GOT system is correctly configured DO...

Страница 8: ...4 Wiring for Power Supply Caution Cut OFF all phases of power source externally before installation or wiring work in order to avoid electric shock or damage to the product Note When wiring the power...

Отзывы: