![Mitsubishi Heavy Industries S3L Скачать руководство пользователя страница 107](http://html1.mh-extra.com/html/mitsubishi-heavy-industries/s3l/s3l_service-manual_1812127107.webp)
FUEL SYSTEM
8-13
2.2.12 Tightening delivery valve holder
(1)
Place the pump housing upright, and grab the housing
with a vise.
(2)
Tighten the delivery valve holder to the specified
torque.
Tightening delivery valve holder
2.2.13 Inspecting control rack for smooth opera-
tion
(1)
Remove the pump housing from the vise and check the
control rack for smooth movement.
If the movement is not smooth, the following defects
are suspected:
· Sliding of the element is poor.
· A foreign substance is present in the teeth
of rack or sleeve.
· The valve holder is overtightened.
(2)
Check the injection timing.
Inspecting control rack for smooth operation
39.2 to 49.0 N·m
{4.0 to 5.0 kgf·m}
[28.9 to 36.2 lbf·ft]
Содержание S3L
Страница 2: ......
Страница 4: ......
Страница 16: ......
Страница 37: ...3 1 SERVICE TOOLS 1 Basic tools 3 2 2 Special tools 3 3 ...
Страница 40: ......
Страница 41: ...4 1 DETERMINATION OF OVERHAUL 1 Determining overhaul timing 4 2 2 Testing compression pressure 4 3 ...
Страница 44: ......
Страница 60: ......
Страница 94: ......
Страница 122: ......
Страница 128: ......
Страница 167: ...ELECTRICAL SYSTEM 12 35 3 5 Installing alternator Installing alternator ...
Страница 168: ...ELECTRICAL SYSTEM 12 36 3 6 Installing starter Installing starter 9 81 to 11 8 N m 1 0 to 1 2 kgf m 7 2 to 8 7 Ibf ft ...
Страница 188: ......
Страница 200: ......