43
OCH779
OPERATING PROCEDURE
PHOTOS/FIGURES
3. Removing R.V. coil
(1) Remove the cabinet and panels. (Refer to 1.)
(2) Disconnect the following connector:
<Inverter P.C. board>
CN602 (R.V. coil)
(3) Remove the R.V. coil.
Photo 5
Photo 6
4. Removing the discharge temperature thermistor,
defrost thermistor, outdoor heat exchanger tempera-
ture thermistor and ambient temperature thermistor
(1) Remove the cabinet and panels. (Refer to 1.)
(2) Disconnect the lead wire to the reactor and the following
connectors:
<Inverter P.C. board>
CN671 (Defrost thermistor, discharge temperature thermis-
tor and outdoor heat exchanger temperature ther
-
mistor)
CN672 (Ambient temperature thermistor)
(3) Pull out the discharge temperature thermistor from its hold-
er. (Photo 8)
(4) Pull out the defrost thermistor from its holder.
(5) Pull out the outdoor heat exchanger temperature thermistor
from its holder.
(6) Pull out the ambient temperature thermistor from its holder.
Outdoor heat
exchanger
temperature thermistor
Ambient
temperature
thermistor
Defrost thermistor
Brazed parts of
4-way valve
Screw of
the R.V. coil
Содержание SUZ-SM35VA
Страница 13: ...13 OCH779 mm inch mm inch 6 OUTLINES AND DIMENSIONS Unit mm SUZ SM35VA TH Unit mm SUZ SM50VA TH ...
Страница 15: ...15 OCH779 15 7 WIRING DIAGRAM SUZ SM35VA TH ...
Страница 16: ...16 OCH779 SUZ SM50VA TH ...
Страница 17: ...17 OCH779 SUZ SM60VA TH ...
Страница 69: ...69 OCH779 ...