63
4
4
When gas pipe is one size larger than standard size for PUHZ-RP100, 125 and 140.
1
Capacity can be obtained by referring to capacity curves of standard size.
3
3
Capacity curve for PUHZ-RP60, 71 models
<When gas pipe is one size smaller than standard size>
5
10
15
20
25
30
35
80
Capacity ratio [%]
Corrected pipe length [m]
85
90
95
100
Heating RP60, RP71 (
[
12.7)
Cooling RP60,RP71 (
[
12.7)
2
2
Capacity curve for PUHZ-RP35, 50 models
<When gas pipe is one size smaller than standard size>
5
10
15
20
25
30
35
80
Capacity ratio [%]
Corrected pipe length [m]
85
90
95
100
Heating RP35, RP50 (
[
9.52)
Cooling RP35 (
[
9.52)
Cooling RP50
(
[
9.52)
Cooling
Heating
OCS05A-3.qxp 06.5.15 0:54 PM Page 63
Содержание PUHZ-RP140VHA2
Страница 40: ...40 WIRED REMOTE CONTROLLER Unit mm 130 120 19 ...
Страница 41: ...41 WIRELESS REMOTE CONTROLLER Unit mm 159 3 55 58 19 ...
Страница 65: ...65 9 2 PLA RP AA 2 9 2 1 FRESH AIR INTAKE AMOUNT ...
Страница 66: ...66 ...
Страница 67: ...67 9 2 2 BRANCH DUCT Installation at site ...
Страница 76: ...76 PEAD RP60GA PEAD RP71GA ...
Страница 77: ...77 PEAD RP100GA ...
Страница 81: ...81 ...