(2)-5. How to connect the external sensor (PAC-SE40TSA)
          to LCD remote controller.

This controller is set for using internal sensor.
If you need the external sensor, please consult your dealer and purchase
option external sensor. (PAC-SE40TSA)
And please change below method.

1. Remove the cover of LCD remote controller.
2. Connect the wire of external sensor to terminal as below.
3. Replace the shunt jumper from "INT" side to "EXT" side as below.
4. Check above connection. (Refer to PAC-SE40TSA Installation manual.)
5. Attach the cover of LCD remote controller.

Section A

Wiring of external sensor

Printed board

Wiring of

LCD remote controller

EXT SENSOR

COMP2
COMP1
4W V
ERROR

JH

INT / EXT

24VAC (L)

24VAC (N)

FAN  HI
FAN  LO

Shunt jumper

Shunt jumper

Replace JH (Shunt jumper) from
INT side to EXT side.

Detail section A

LCD remote controller inside

Wiring of LCD remote controller

Wiring external sensor

External sensor PAC-SE40TSA

Cover

(3) Switch box (Field supply)

In case of using switch box (field supply), please wires as shown in the
below. 
Remove the panel on the right side (PRC-8,10,12) or the rear side
(PRC-15,20,24,32) of the unit and connect the units power supply wiring to
the proper terminals in the control box.
Connect the wires on the basis of the following wiring diagram.
If mistook the connection, the controller is damaged.

PRC-15,20,24

PRC-8,10,12

(4) Wiring example (For metal piping)

Table above is an example. 
The selection of other capacities should be determined in accordance
with the relevant standards.

Over current

protection switch

PRC-8

Power

cable

14mm

2

Earth cable

PRC-10

PRC-12

PRC-15

14mm  over

50A

2

14mm

14mm

2

2

14mm  over

50A

2

14mm  over

75A

2

38mm

2

22mm  over

100A

2

50A

50A

75A

100A

PRC-20

PRC-24

PRC-32

38mm

38mm

2

2

22mm  over

100A

2

22mm  over

100A

2

60mm

2

30mm  over

175A

2

100A

100A

175A

PRC-8

PRC-10

PRC-12

PRC-15

NV is a product of MITSUBISHI ELECTRIC.
Table above is an example. The selection of other capacities should
be determined in accordance with the relevant standards.

(5) Selecting earth leakage breaker (NV)

To select NF or NV instead of a combination of Class B fuse switch
use the following.
In the case of Class B fuse rated 15A.

   Fuse
 (class B)

50A

50A

75A

100A

   Earth leakage breaker
(with over-load protection)

NV50-CP

30mA 0.1s or less

NV100-CP

100mA 0.1s or less

NV50-CP

30mA 0.1s or less

NV100-CP

100mA 0.1s or less

50A

50A

75A

100A

PRC-20

PRC-24

PRC-32

100A

100A

175A

NV100-CP

100mA 0.1s or less

NV100-CP

100mA 0.1s or less

NV225-CP

100mA 0.1s or less

100A

100A

175A

8. Before starting the trial run.

After having installed the unit, check that:

Phase protector is installed in PRC-8,10,15,20 due to scroll compressor.
But not installed in PRC-12,24,32,because reciprocating compressor are
installed.

Breaker

capacity

1.  The unit is fixed securely.
2.  The unit is installed properly.
3.  The drain pipe is provided with a drain trap.
4.  The electrical wiring has been connected correctly and the terminal
     screws have been properly tightened.
5.  The duct work has been performed correctly.
6.  Before turning the unit on, measure the resistance between the
     terminals of the electrical parts and ground with a 500V megger
     and check that the value is at least 1.0M ohm.
     If the measured value is below 1.0M ohm, do not operate the unit.
7.  The unit is used phase protector (47).(In case of PRC-8,1015,20)
     If wiring phase of power supply is mistaken, the unit does not run.
     Please reconfirm and modify wiring phase.
8. Turn universal power supply at least 6 hours before getting test run
     in order to current to crank heater.(In case of PRC-12,24,32)
     If current-carrying hours are too short,it may result in a malfunction
     of compressor.
9.  Check that the fans are rotating in the proper direction.
10.  Check to see whether there are refrigerant leakage, and slack power or
     transmission cable.
11. Check the operation of high-pressure switch.
      If the two lead wires of the outdoor unit fan motor are disconnected
      from the contactor and cooling is performed, the high-pressure switch
      should operate and stop the unit after 5 to 10 minutes.  

Perform trial operation after completion above items.

Switch box
(Field supply)

CZ

FZ

GRAY

23WA

SW

TB2

1

4

GRAY

2

3

52F

CZ

FZ

GRAY TB2 1

GRAY

3

5

TCZ

4

TB2

6

 23

WA1

 23

WA2

SW

Switch box
(Field supply)

TB2

   F2
(3.15A)

C03

1

C04

1

C03

1

SILVER

     RED

   F2
(3.15A)

C03

1

C04

1

C03

1

SILVER

     RED

AC
24V

Tr

AC
24V

Tr

3

3

C03

3

3

C03

3

PRC-32

CZ

FZ

GRAY TB2 1

GRAY

3

5

TCZ2

4

TB2

6

 23

WA1

 23

WA2

SW

Switch box
(Field supply)

Symbol

SW

23WA

23WA1
23WA2

                name
Switch(on)
Thermostar(room temp.)
Thermostar(Low room temp.)
Thermostar(High room temp.)

   F2
(3.15A)

C03

1

C04

1

C03

1

SILVER

     RED

AC
24V

Tr

3

3

C03

3

TCZ1

Power supply cords of appliances shall not be ligther than design 245
IEC or 227 IEC.
A switch with at least 3 mm contact separation in each pole shall be
provided by the Air conditioner installstion.

Note.
All electrical wiring must be comply with local electrical
authority regulations.

Содержание PRC- 8MYA

Страница 1: ...s manual to have the correct safe use before installation 2 Please keep this manual in the place where it is always seen to use this manual with Operation manual after reading 3 The customer must not install and not transfer the unit by themselves Safety and the function cannot be secured INSTALLATION MANUAL Service ref PRC 8MYA 03 PRC 10MYA 03 PRC 12MYA 03 PRC 15MYA 03 PRC 20MYA 03 PRC 24MYA 03 P...

Страница 2: ...tallation may cause a fire electric shock or water leakage Use only the specified refrigerant R 22 to charge the refrigerant circuit Do not mix it with any other refrigerant and do not allow air to remain in the circuit Air enclosed in the circuit can cause high pressure resulting in a rupture and other hazards Arrange the configuration of wiring not to bring up the panel and terminal cover and fa...

Страница 3: ...and discard plastic packing bags so that children will not play any of them If children play with a plastic bags which was not torn off it may cause a risk of suffocation 2 The base and attachments of the unit should be periodically checked for looseness cracks or other damage If such defects are left uncorrected the unit may fall and cause personal injury or property damage 3 Before starting 2 Se...

Страница 4: ... 8 PRC 10 360 Weight of unit kg 390 PRC 12 395 4 Preparation before installation unit mm Except Drain size unit inch Condenser inlet Electrical control circuit compressor service Electrical control circuit compressor service Evaporator coil fan assy service 300 300 700 1200 Condenser inlet 300 Condenser inlet 300 Evaporator coil service 1000 300 700 300 Evaporator coil fan assy service A 1500 Cond...

Страница 5: ...00 200 200 200 200 72 B DETAIL A DETAIL 2032 25 2032 25 15 25 15 25 PRC 15 PRC 20 655 Weight of unit kg 755 PRC 24 765 AIR RETURN AIR SUPPLY A B BOX CONTROL CONDENSER AIR INLET 3 SIDES CONDENSER AIR INLET 3 SIDES AIR WIRING HOLE 6 15X25MTGHOLES BOTH SIDE DRAIN R1 RETURN AIR SUPPLY 3 SIDES AIR INLET CONDENSER 140 1820 140 25 2142 BOLT PITCH 25 46 2100 46 51 51 2100 250 800 BOLT PITCH 800 BOLT PITCH...

Страница 6: ... Duct Roof curb Duct Duct work length 850mm or more Duct connection with a vertical air plenum 5 2 Lifting method When the unit is to be lifted and moved attach ropes to the suspension plates 4 p c s provided on the top of the unit When the unit is lifted it is center of gravity tends to shift the unit one side and so balance such as that in the figure below should be attained The angles at which ...

Страница 7: ...ain switch fuse field supply Power supply wiring for unit unit f g Connection wiring for unit remote controller Earth b c g PE e f In case of PRC 15 20 24 32Y d Band for wires Screw for earth connection Terminal block for power supply wires Terminal block for connection wires to switch box Field supply or LCD remote controller Option PAC 204RC Control module of unit PRC 15 20 24 Band for wires Scr...

Страница 8: ...ally FUNCTION Not change Not change Not change Note Seal the wire lead in hole completely with putty TB1 DIP SW TB2 1 ON 2 3 4 Controller board Outline Key cover open COMP2 COMP1 4WV ERROR 24VAC N 24VAC L FAN HI FAN LO EXT SENSOR JH INT EXT Refer to 2 4 Refer to 2 3 Refer to 2 5 1 This function can not use at above models because the fan speed of these models is constant 2 If need this function pl...

Страница 9: ...75A 100A PRC 20 PRC 24 PRC 32 100A 100A 175A NV100 CP 100mA 0 1s or less NV100 CP 100mA 0 1s or less NV225 CP 100mA 0 1s or less 100A 100A 175A 8 Before starting the trial run After having installed the unit check that Phase protector is installed in PRC 8 10 15 20 due to scroll compressor But not installed in PRC 12 24 32 because reciprocating compressor are installed Breaker capacity 1 The unit ...

Страница 10: ... the contact address telephone number on the operation manual before handing it to the customer HEAD OFFICE MITSUBISHI DENKI BLDG MARUNOUCHI TOKYO 100 0005 TELEX J24532 CABLE MELCO TOKYO Specifications subject to change without notice ...

Отзывы: