43
Photo 15
OPERATING PROCEDURE
PHOTOS
Coil support fixing screw
Photo 16
Coil support
Heat exchanger fixing screws
Piping cover
Coil plate
Heat exchanger
Coil support
fixing screws
Coil supports
Heat exchanger fixing screws
Coil plate
Heat exchanger
Piping cover
Photo 17
Do not hold this floating part
when lifting; Doing so will cause
malfunction.
Float switch
Float switch base
Float switch base
and lead wire fixing
band
U shaped portion of the
float switch base
14. Removing the heat exchanger
(1) Remove the drain pan. (Refer to procedure 10)
(2) Remove the piping cover (tapping screw 4×10: 3
screws).
(3) Remove the coil plate (tapping screw 4×10: 2
screws).
(4) Remove the heat exchanger fixing screws (tapping
screw 4×10: 2 screws).
(5) Remove the coil support (tapping screw 4×10: 1
screw each)
■ RP35–60: 1 coil support (See photo 16)
■ RP71–140: 3 coil supports (See photo 17)
(6) Remove the heat exchanger.
13. Removing the float switch (FS)
(1) Remove the drain pan. (Refer to procedure 10)
(2) Loosen the clamp of the drain pump. (See Photo 14)
(3) Remove the float switch (tapping screw 4×10: 1 screw/1
hook). (See Photo 14)
(4) Remove the float switch base and the lead wire fixing band.
(See Photo 15)
(5) Remove the lead wire from the U shaped portion of the
float switch base. (See Photo 15)
(6) Slide the float switch towards the arrow to remove from the
float switch base.
OCH626A