![Mitsubishi Electric PEFY-P100VMM-E Скачать руководство пользователя страница 22](http://html.mh-extra.com/html/mitsubishi-electric/pefy-p100vmm-e/pefy-p100vmm-e_service-manual_1811446022.webp)
OPERATING PROCEDURE
PHOTOS
3.Removing the fan casing and sirocco fan
(1) Remove the fan casing fixing screws (four for each fan).
(2) Remove the fan motor shaft fixing screw (one for each fan)
and remove the fan casing and sirocco fan.
4.Removing the fan motor
(1) Remove the
Be careful on removing heavy parts.
fig.3
8-7. HEAT EXCHANGER
OPERATING PROCEDURE
PHOTOS
1.Remove the drainpan with procedure 8-4
2.Remove the bottom plate 2 with procedure 8-5
3.Removing Heat exchanger
(1) Remove the fixing screws (four) of the heat exchanger (M)
and remove the heat exchanger.
fig.1
fig.2
Remove the motor clamps (L) two clamps secure the motor
capacitor cable (K).
(2)
on each side (over the rubber bushing).
5.Re-assemble
(1) Re-assemble in reverse order.
Note: Piping, pipe cover and thermistor wires to be removed
first.
4.Re-assemble
(1) Re-assemble in reverse order.
21
(J)
(K)
(L)
Fan motor shaft
fixing screw
(M)
Содержание PEFY-P100VMM-E
Страница 23: ......