8 FUNCTIONS
8.3 CC-Link IE TSN Network Synchronous Communication Function
163
8
Synchronization output timing setting control
This control changes an output status according to the timing that is set based on the synchronization cycle start timing.
Set the following for each synchronization cycle.
• Synchronization output timing setting Y0 OFF to ON: Set the timing to change the output from off to on.
• Synchronization output timing setting Y0 ON to OFF: Set the timing to change the output from on to off.
Synchronization output timing setting Y0 OFF to ON: 200
s, Synchronization output timing setting Y0 ON to OFF: Do not
change the output from on to off.
Synchronization output timing setting Y0 OFF to ON: Do not change the output from off to on, Synchronization output
timing setting Y0 ON to OFF: 800
s
Synchronization output timing setting Y0 OFF to ON: Do not change the output from off to on, Synchronization output
timing setting Y0 ON to OFF: Do not change the output from on to off.
The output module performs the output control according to the settings, at the second synchronization cycle from the
setting.
(1) Synchronization cycle
(2) Input
(3) Operation
(4) Output
(5) The output has been turned on 200
s later.
(6) The output has been turned off 800
s later.
ON
OFF
Ò
Ò
Ò
Ó
(6)
(2) (3) (4)
(2) (3) (4)
(2) (3) (4)
(2) (3) (4)
(2) (3) (4)
(2) (3) (4)
(1)
Õ
Ö
Ô
(5)
(5)
Scan program
Synchronization
control interrupt
program
External output Y0
(Status of the Y0
terminal)
I/O module
Содержание NZ2GN2B1-32D
Страница 2: ......
Страница 112: ...110 4 PROCEDURES BEFORE OPERATION MEMO ...
Страница 193: ...10 MAINTENANCE AND INSPECTION 191 10 MEMO ...
Страница 263: ...I 261 MEMO ...
Страница 267: ......