80
CHAPTER 4
PROCEDURES BEFORE OPERATION
This chapter describes the procedures before operation.
(1) When using the module as a temperature input module
●
A proper performance of temperature compensation is required for the NZ2GF2B-60TCTT4 which uses a thermocouple
for the temperature sensors. Perform warm-up operation about 15 minutes before starting operation.
●
To replace the module, follow the procedure described below.
• Turn off the power of the module and remove the temperature control module.
• Prepare a new temperature control module and follow the above procedure from "Setting a station number" to
"Parameter settings and programming". (The network parameter of the master station does not need to be set
again.)
• After checking the operation, restart the control.
For details on the setting of station numbers, refer to
the following.
•
For details on the mounting, refer to the following.
•
•
For details on the wiring, refer to the following.
•
•
•
For details on the parameter settings and
programming, refer to the following.
•
•
•
Check box
Set a station number for a temperature control module.
Station number setting
Connection
Mount the temperature control module to a DIN rail.
Connect the temperature control module to a power supply,
Ethernet cables, and external devices.
Parameter settings and programming
Set parameters and create a program.
Warm-up operation
(when the NZ2GF2B-60TCTT4 is used)
Perform a warm-up operation for about 15 minutes before starting
an operation.
Wiring
Содержание NZ2GF2B-60TCRT4
Страница 1: ...CC Link IE Field Network Temperature Control Module User s Manual NZ2GF2B 60TCTT4 NZ2GF2B 60TCRT4 ...
Страница 2: ......
Страница 86: ...84 Memo ...
Страница 233: ...231 CHAPTER 8 FUNCTIONS 8 8 4 CC Link IE Field Network Function 3 Click the OK button on the following window ...
Страница 268: ...266 Memo ...
Страница 377: ...375 APPENDICES A Appendix 6 External Dimensions Memo ...
Страница 383: ...I 4 4 7 8 381 Memo ...
Страница 387: ......