120
7.2
Changing Parameters
This section describes the procedures to change parameters.
The precautions to take when changing parameters are same as the following.
• Precautions (
7.2.1
Changing the network configuration
When changing the network configuration using the created project, set the parameter in the following procedure.
1.
Power off the module.
2.
Connect the modules again according to the desired network configuration.
3.
Power on the module.
4.
Display the CC IE Field Configuration window.
• When the master/local module is the QJ71GF11-T2
Project window
[Parameter]
[Network Parameter]
[Ethernet/CC IE/MELSECNET]
[CC IE
Field Configuration Setting] button
• When the master/local module is the LJ71GF11-T2
Project window
[Parameter]
[Network Parameter]
[Ethernet/CC IE Field]
[CC IE Field
Configuration Setting] button
Содержание NZ2GF2B-60TCRT4
Страница 1: ...CC Link IE Field Network Temperature Control Module User s Manual NZ2GF2B 60TCTT4 NZ2GF2B 60TCRT4 ...
Страница 2: ......
Страница 86: ...84 Memo ...
Страница 233: ...231 CHAPTER 8 FUNCTIONS 8 8 4 CC Link IE Field Network Function 3 Click the OK button on the following window ...
Страница 268: ...266 Memo ...
Страница 377: ...375 APPENDICES A Appendix 6 External Dimensions Memo ...
Страница 383: ...I 4 4 7 8 381 Memo ...
Страница 387: ......