46
CHAPTER 4
PROCEDURE BEFORE THE
OPERATION
This chapter describes the procedure to be taken before operating the Ethernet adapter module.
4.1
Start-Up Procedure
The following shows how to start up the system where the Ethernet adapter module is used.
1.
Setting on the master station
Set network parameters on the master station. For details, refer to the following.
User's manual for the master/local module used
2.
Installation
Mount the module to the DIN rail, and wire the power supply part. (
Page 54, Section 6.1, Page 55,
Section 6.2, Page 61, Section 6.4.1)
3.
Unit test
Check the Ethernet adapter module for hardware failure. (
4.
Ethernet cable connection
Connect Ethernet cables to the Ethernet adapter module. (
5.
Parameter setting
Set parameters for connection to CC-Link IE Field Network and Ethernet. (
Page 188, Section 10.3, Page 200, Section 10.5)
6.
Data link start
Shift the switch on the Ethernet adapter module to RUN. (
7.
CC-Link IE Field Network diagnostics
Check whether communication can be normally performed using the CC-Link IE Field Network
diagnostics on the master station.
For details, refer to the following.
User's manual for the master/local module used,
8.
Communications with an external device
Send SLMP using an external device. (
• Using the on-demand function enables data to be sent from the Ethernet adapter module to an external
device. (
• IP communications can be performed between external devices over CC-Link IE Field Network. (
9.
Ethernet diagnostics
Check whether communication can be normally performed using the Ethernet adapter diagnostics. (
Содержание NZ2GF-ETB
Страница 1: ...CC Link IE Field Network Ethernet Adapter Module User s Manual NZ2GF ETB ...
Страница 2: ......
Страница 49: ...47 CHAPTER 4 PROCEDURE BEFORE THE OPERATION 4 4 1 Start Up Procedure Memo ...
Страница 82: ...80 10 The following dialog box is displayed 11 Set the switch on the Ethernet adapter module to RUN Click ...
Страница 198: ...196 a Detail Setting ...
Страница 246: ...244 Memo ...
Страница 253: ......