CHAPTER 4 PROCEDURES BEFORE OPERATION
4
CHAPTER 4
PROCEDURES BEFORE OPERATION
This chapter describes the procedures before operation.
*1
To replace the module, refer to the point below.
To replace the module, follow the procedure described below:
• Turn off the module power supply and remove the D/A converter module.
• Prepare a new D/A converter module and follow the illustration above as instructed from "Setting a station
number" to "Parameter settings and programming". (No re-setting of network parameters of the master station is
required.)
• If necessary to use the user range, perform the offset/gain setting.
• Carry out operation check and then restart the control.
Page 50, Section 6.2
Page 52, Section 6.3
Page 57, Section 6.4
Page 59, Section 6.5
Page 62, Section 6.6
Set the station number of the main D/A converter module.
Setting a station number
Check box
Connection
When using an extension module, connect the extension module to
the main D/A converter module.
After that, mount the main D/A converter module on a DIN rail.
Carry out wiring of a power supply, Ethernet cables, and external devices
to the main D/A converter module.
When using an extension module, carry out wiring of a power supply and
external devices to the extension module.
Wiring
Parameter settings and programming
Set parameters and create a program.
Offset/gain setting
To use user range, configure the offset/gain setting.
Содержание NZ2EX2B-60DA4
Страница 1: ...CC Link IE Field Network Digital Analog Converter Module User s Manual NZ2GF2BN 60DA4 NZ2EX2B 60DA4 ...
Страница 2: ......
Страница 48: ...46 Memo ...
Страница 150: ...148 Memo ...
Страница 227: ......