4-1. PURGING PROCEDURES AND LEAK TEST

Fig. 

Fig. 2

Fig. 3

Fig. 4

Fig. 5

Fig. 6

3.  FLARING WORK AND PIPE CONNECTION

3-1. FLARING WORK

Pipe diameter 

(mm)

Nut 

(mm)

A (mm)

Tightening torque

Clutch 

type tool  

for R40A

Clutch 

type tool  

for R22

Wing nut 

type tool  

for R22

N•m

kgf•cm

ø6.35 (/4”)

7

0 to 0.5

.0 to .5

.5 to 2.0

3.7 to 7.7 40 to 80

ø9.52 (3/8”)

22

34.3 to 4.2 350 to 420

ø2.7 (/2”)

26

2.0 to 2.5

49.0 to 56.4 500 to 575

ø5.88 (5/8”)

29

73.5 to 78.4 750 to 800

Tilted Uneven Burred

Good

No good

Burr

Copper pipe

Spare reamer

Pipe cutter

Smooth all 
around

Even length 
all around

Inside is shin-
ing without any 
scratches.

Flare nut

Die

Copper pipe

Clutch type

Flaring tool

Wing nut type

3-2. PIPE CONNECTION

1) Apply a thin coat of refrigeration oil (G) to the flared ends of the pipes 

and the pipe connections of the outdoor unit. Do not apply refrigeration 
oil on screw threads. Excessive tightening torque will result in damage  
on the screw.

2) Align  the  center  of  the  pipe  with  that  of  the  pipe  connections  of  the 

outdoor unit, then hand tighten the flare nut 3 to 4 turns.

3) Tighten the flare nut with a torque wrench as specified in the table.

•  Over-tightening may cause damage to the flare nut, resulting in re

-

frigerant leakage.

•  Be sure to wrap insulation around the piping. Direct contact with the 

bare piping may result in burns or frostbite.

3-3. INSULATION AND TAPING

) Cover piping joints with pipe cover.
2) For outdoor unit side, surely insulate every piping including valves.
3) Using  piping  tape  (E),  apply  taping  starting  from  the  entry  of  outdoor 

unit.
•  Stop  the  end  of  piping  tape  (E)  with  tape  (with  adhesive  agent  at-

tached).

•  When  piping  have  to  be  arranged  through  above  ceiling,  closet  or 

where the temperature and humidity are high, wind additional com-
mercially sold insulation to prevent condensation.

4.  PURGING PROCEDURES, LEAK TEST, AND TEST RUN

Copper 
pipe

) Cut the copper pipe correctly with pipe cutter. (Fig. , 2)
2) Completely remove all burrs from the cut cross section of pipe. (Fig. 3)

•  Aim  the  copper  pipe  downward  while  removing  burrs  to  prevent 

burrs from dropping in the pipe.

3) Remove flare nuts attached to indoor and outdoor units, then put them 

on pipe having completed burr removal. (Not possible to put them on 

after flaring work.) 

4) Flaring  work  (Fig.  4,  5).  Firmly  hold  copper  pipe  in  the  dimension 

shown  in  the  table.  Select  A  mm  from  the  table  according  to  the  tool 
selected.

5) Check 

•  Compare the flared work with Fig. 6.

•  If flare is noted to be defective, cut off the flared section and do flar

-

ing work again.

) Remove service port cap of stop valve on the side of the outdoor unit 

gas pipe. (The stop valves are fully closed and covered in caps in their 
initial state.)

2) Connect  gauge  manifold  valve  and  vacuum  pump  to  service  port  of 

stop valve on the gas pipe side of the outdoor unit.

3) Run the vacuum pump. (Vacuumize for more than 5 minutes.)
4) Check the vacuum with gauge manifold valve, then close gauge mani-

fold valve, and stop the vacuum pump.

5) Leave as it is for one or two minutes. Make sure the pointer of gauge 

manifold  valve  remains  in  the  same  position.  Confirm  that  pressure 

gauge shows -0.0 MPa [Gauge] (-760 mmHg).

6) Remove gauge manifold valve quickly from service port of stop valve.
7) Fully open all stop valves on the gas pipe and the liquid pipe. Operat-

ing without fully opening lowers the performance and this causes trou-
ble.

8) Refer  to  -2.,  and  charge  the  prescribed  amount  of  refrigerant  if 

needed.  Be  sure  to  charge  slowly  with  liquid  refrigerant.  Otherwise, 
composition of the refrigerant in the system may be changed and af-
fect performance of the air conditioner.

9) Tighten cap of service port to obtain the initial status.
0) Leak test

 

WARNING

When  installing  the  unit,  securely 
connect  the  refrigerant  pipes  before 
starting the compressor.

Gauge manifold 
valve 
(for R40A)

Compound pressure 
gauge (for R40A)

Handle High

Charge hose 
(for R40A)

Pressure gauge
(for R40A)

-0.0MPa  
(-760 mmHg)

Handle Low

Vacuum pump
(for R40A)

Stop valve cap
(Torque 9.6 to 
29.4 N•m, 200 
to 300 kgf•cm)

Pull the handle toward you 
and rotate /4 turn in a counter 
clockwise direction to open.

Push in the handle and rotate the 
cap back to its original position.

Cap

*Close

*Open

Hexagonal 
wrench

*4 to 5 turns

Service port cap
(Torque 3.7 to 
7.7 N•m, 40 to 
80 kgf•cm)

Open

Close

 

CAUTION

When  there  are  the  ports  which  are 
not  used,  make  sure  their  nuts  are 
tightened securely.

JG79A665H01_en.indd   5

2012/09/24   19:20:04

Содержание MXZ-6C122VA

Страница 1: ...nuale di instal lazione Εγχειρίδιο εγκατάστασης Για τον ΤΕΧΝΙΚΟ Στο παρόν εγχειρίδιο περιγράφεται μόνο η εγκατάσταση της μονάδας εξωτερικού χώρου Για την εγκατάσταση της μονάδας εσωτερικού χώρου ανατρέξτε στο εγχειρίδιο εγκατάστασης της μονάδας εσωτερικού χώρου Manual de Instalação Para o INSTALADOR Este manual descreve apenas a instalação da unidade exterior Quando proceder à instalação da unidad...

Страница 2: ...d ance with EN378 1 n Check that the refrigerant gas does not leak after installation has been completed If refrigerant gas leaks indoors and comes into contact with the flame of a fan heater space heater stove etc harmful substances will be generated n Use appropriate tools and piping materials for installation The pressure of R410A is 1 6 times more than R22 Not using appropri ate tools or mater...

Страница 3: ...ar outdoor unit so as to reduce vibration transmitted from there 500 or more 200 or more 350 or more 100 or more 100 or more 500 or more 100 or more Service space 350 or more 350 or more When installing the unit in an area that is enclosed with walls such as a verandah be sure to have enough space as shown below In this case the air conditioning capacity and power consumption might deteriorate Whe...

Страница 4: ...t 1 1 Note Place indoor outdoor unit connecting wire B and power supply cord A at least 1 m away from the TV antenna wire The Q ty for B to K in the above table is quan tity to be used per indoor unit More than 100 mm Open as a rule More than 500 mm if the front and both sides are open More than 100 mm More than 200 mm if there are obstacles to both sides Open as a rule More than 500 mm if the bac...

Страница 5: ...utdoor unit connecting wire B from the indoor unit correctly on the terminal block Be careful not to make mis wiring Fix the wire to the terminal block securely so that no part of its core is appeared and no external force is conveyed to the connecting section of the terminal block 3 Firmly tighten the terminal screws to prevent them from loosening Af ter tightening pull the wires lightly to confi...

Страница 6: ...3 Remove flare nuts attached to indoor and outdoor units then put them on pipe having completed burr removal Not possible to put them on after flaring work 4 Flaring work Fig 4 5 Firmly hold copper pipe in the dimension shown in the table Select A mm from the table according to the tool selected 5 Check Compare the flared work with Fig 6 If flare is noted to be defective cut off the flared section...

Страница 7: ...o lock the operation mode in COOL DRY mode set the 2 of SW1 on the outdoor controller board to OFF To lock the operation in HEAT mode set the same switch to ON 4 Turn on the main power for the air conditioner Description of the function With this function the operating noise of the outdoor unit can be lowered by reducing the operation load for example during nighttime in COOL mode However please n...

Страница 8: ...ED indication during detection LED1 Red LED2 Yellow LED3 Green Lighted Lighted Once Result of piping wiring correction function LED1 Red LED2 Yellow LED3 Green Result Lighted Not lighted Lighted Completed Problem corrected or normal Once Once Once Not completed Detection failed Other indications Refer to SAFETY PRE CAUTIONS WHEN LED FLASHES located behind the service panel 5 RELOCATION AND MAINTEN...

Страница 9: ... numéro de série de l appareil se trouve sur la plaque du produit Opmerking het serienummer staat op het naamplaatje van het product Nota El número de serie se encuentra en la placa que contiene el nombre del producto Nota il numero di serie si trova sulla targhetta del prodotto Σημείωση Ο σειριακός του αριθμός βρίσκεται στην πινακίδα ονόματος του προϊόντος Nota o número de série encontra se na pl...

Отзывы: