97
OPERATING PROCEDURE
PHOTOS
4. Removing the expansion valve
(1) Remove the top panel (Photo 1,2).
(2) Remove the service panel (Photo 1).
(Gas recovery is not required if the unit is pumped down.)
(3) Remove the font panel for removing LEV F (Photo 1).
(4) Remove the electrical parts for removing LEV F (Photo 3).
(5) Remove the LEV coils.
(6) Detach the brazed parts of expansion valves and pipes.
Expansion
valves
Photo 7
LEV coils
Expansion valve F
LEV coil F
5. Removing the reactor
(1) Remove the top panel (Photo 1).
(2) Disconnect the reactor lead wire.
(3) Remove the screws of the reactor, and remove the reactor.
Photo 8
Screws of the reactor
OBH554D
Содержание MXZ-2B30VA
Страница 19: ...19 WIRING DIAGRAM 6 MXZ 2B30VA MXZ 2B40VA MXZ 2B52VA TB3 TB2 TB1 OBH554D ...
Страница 20: ...20 MXZ 3B54VA OBH554D ...
Страница 21: ...21 MXZ 3B68VA OBH554D ...
Страница 22: ...22 MXZ 4B71VA OBH554D ...
Страница 23: ...23 MXZ 4B80VA OBH554D ...
Страница 24: ...24 MXZ 5B100VA OBH554D ...