OPERATING PROCEDURE
PHOTOS
4. Removing the nozzle assembly
(1) Remove the panel (Refer to 1.) and the corner box.
(2) Remove the indoor/outdoor connecting wire. (Refer to 2.)
(3) Remove the indoor electronic control P.C. board holder
(4) Disconnect the following connectors:
<Indoor electronic control P.C. board>
CN1R1 (Interlock switch)
(5) Pull out the drain hose from the nozzle assembly and
remove the nozzle assembly.
(6) Remove the interlock switch.
Photo 4
Photo 5
5. Removing the horizontal vane motor
(1) Remove the nozzle assembly. (Refer to 4.)
(2) Remove the screws of the horizontal vane motor unit.
(3) Disconnect the connector from the horizontal vane
motor.
(4) Remove the screws of the horizontal vane motor.
(5) Remove the horizontal vane motor from the horizontal
vane motor unit.
47
Screws of horizontal vane motor unit
Interlock switch
Screws of the interlock switch
OBH531E
Содержание MSZ-GE22VA-A1
Страница 53: ...53 OBH531E ...