14
7
OUTLINES AND DIMENSIONS
PUHZ-RP1.6VHA
PUHZ-RP2VHA
Service panel
for charge plug
w
1 In the place where short cycle tends to occur, cooling and heating
capacity and power consumption might get lowered 10%. Air outlet
guide (optional PAC-SG58SG) will help them improve.
w
2 If air discharges to the wall, the surface might get stained.
Minimum installation space for outdoor unit
100 mm or more as long as
no obstacle is placed on the
rear and light-and-left sides
of the unit.
2 sides should be open in
the right, left and rear side.
w
2
w
1
100 mm or more
500 mm or more
Basically open
100 mm or more
Free space around the outdoor unit
(basic example)
350 mm or more
w
1
Air intake
Air discharge
Air intake
Connection for
gas pipe
Service port
Connection for
liquid pipe
Service panel
4-10
o
21 oval hole
(M10 foundation bolt)
[
33 drain hole
[
33 drain hole
43.6
152
155
400
347.5
45.4
365
330
300
40
Handle for
moving
600
10
300
150
287.5
Installation bolt pitch: 500
800
69
35
43
183
90
155
23
32.5
18
1. FOUNDATION BOLTS
2. PIPING-WIRING DIRECTION
Piping and wiring connection can
be made from the rear direction only.
3. ATTACHING THE CONDUIT
In order to attach the conduit, it is
necessary to fix the metal plate with
2 screws to the back panel. Procure
the metal plate and make screw holes
locally. It is recommended to use the
metal plate shown below. Align the
metal plate to the marks on the unit
and attach it.
<Foundation bolt height>
Please secure the unit firmly
with 4 foundation (M10) bolts.
(Bolts, washer and nut must
be purchased locally.)
18 or below
40
20
60
80
w
Conduit hole
w
The position and the size of
conduit hole depend on the
conduit to be used.
Holes for metal plate fixing screw
w
The size of hole depends on the
screw to be used.
FOUNDATION
Unit : mm
OC294-D-1.qxp 05.3.9 11:01 AM Page 14