40
4 PROCEDURE BEFORE OPERATION
4.1 Procedure Before Operation
4
PROCEDURE BEFORE OPERATION
4.1
Procedure Before Operation
This section explains the procedure before operating the CC-Link IE Field Network board.
Page 46 Setting Channel Numbers
Page 47 Tests Before Wiring (Standalone Tests of the Board)
Start
Check
Install the software package on a personal computer.
Install the software package
Install the board
Install the board to a slot on the personal computer.
Set the channel number
Set the channel number and confirm it with the utility.
Check the board
Test the hardware of the installed board.
Wire the cables
Wire the network cables for the installed board.
Set the parameters
Set the parameters and check them with the utility.
Check the network
Test the cable connection and data link on the network.
Execute a user program
Execute a user program or utility.
End
Содержание MELSEC Q80BD-J71GF11-T2
Страница 2: ......
Страница 6: ...4 Disposal Precautions CAUTION When disposing of this product treat it as industrial waste ...
Страница 118: ...116 12 MONITORING MEMO ...
Страница 140: ...138 14 MELSEC DATA LINK LIBRARY MEMO ...
Страница 142: ...140 15 PROGRAMMING 15 1 Precautions on Programming MEMO ...
Страница 243: ...241 I U Utility 83 ...
Страница 247: ......