background image

JY997D29501F

Safety Precaution

 (Read these precautions before using.)

Before using this product, please read this manual and the relevant manuals
introduced in this manual carefully and pay full attention to safety to handle the
product correctly.
The precautions given in this manual are concerned with this product.
In this manual, the safety precautions are ranked as "WARNING" and
"CAUTION".

Depending on circumstances, procedures indicated by "CAUTION" may also be
linked to serious results. 
In any case, it is important to follow the directions for usage.

Indicates that incorrect handling may cause hazardous
conditions, resulting in death or severe injury.

Indicates that incorrect handling may cause hazardous
conditions, resulting in medium or slight personal injury
or physical damage.

MOUNTING PRECAUTIONS

Use the memory loader in the environment that satisfies the general

specifications described in GT10 User's manual. Never use the product in

areas with excessive dust, oily smoke, conductive dusts, corrosive gas (salt

air, Cl

2

, H

2

S, SO

2

 or NO

2

), flammable gas, vibration or impacts, or exposed

to high temperature, condensation, or rain and wind. Not doing so can cause

an electric shock, fire, malfunction or product damage or deterioration.

STARTUP/MAINTENANCE 
PRECAUTIONS

Do not disassemble or modify the memory loader.

Doing so can cause a failure, malfunction, injury or fire.

Do not touch the conductive and electronic parts of the memory loader

directly. Doing so can cause a memory loader malfunction or failure.

When unplugging the cable connected to the GOT, do not hold and pull the

cable portion. Doing so can cause the memory loader or cable to be

damaged or can cause a malfunction due to a cable connection fault.

Do not bent at a sharp angle or tie the memory loader cables. 

Doing so can cause the breaking of the cables.

DISPOSAL PRECAUTIONS

When disposing of the product, handle it as industrial waste.

TRANSPORTATION 
PRECAUTIONS

Make sure to transport the memory loader and/or relevant unit(s) in the

manner they will not be exposed to the impact exceeding the impact

resistance described in the general specifications of this manual, as they are

precision devices. Failure to do so may cause the unit to fail.

Compliance with EC directive (CE Marking)

This note does not guarantee that an entire mechanical module produced in
accordance with the contents of this note will comply with the following standards.
Compliance to EMC directive for the entire mechanical module should be checked by
the user / manufacturer. For more details please contact the local Mitsubishi Electric
sales site.

Attention

This product is designed for use in industrial applications.

Authorized Representative in the European Community:

Mitsubishi Electric Europe B.V.
Gothaer Str. 8, 40880 Ratingen, Germany

Requirement for Compliance with EMC directive

The following products have shown compliance through direct testing (to the identified
standards) and design analysis (forming a technical construction file) to the European
Directive for Electromagnetic Compatibility (2004/108/EC) when used as directed by
the appropriate documentation.
Type :Programmable Controller (Open Type Equipment)

For more details please contact the local Mitsubishi Electric sales site.

Associated Manuals

The following manuals are relevant to this product. When these loose manuals are
required, please consult with our local distributor.

Bundled Items

 

Standard

Remark

EN61131-2 : 2007

Programmable 

controllers- 

Equipment, 

requirement and tests

EMI Compliance with all relevant aspects of the

standard. (Radiated Emissions)

EMS

Compliance with all relevant aspects of the

standard. 

(ESD, RF electromagnetic field, EFTB, Surge, RF

conducted disturbances and Power frequency

magnetic field)

Manual name

Contents

Manual 

Number

(Model Code)

GT10 User's Manual 

Describes the GT10 hardware-relevant 

content such as part names, external 

dimensions, mounting, power supply 

wiring, specifications, and introduction to 

option devices.

(sold separately)

JY997D24701

(09R819)

GT Designer2

Version2 Basic

Operation/Data

Transfer Manual

(For GOT1000 Series)

Describes methods of the GT Designer2 

installation operation, basic operation for 

drawing and transmitting data to 

GOT1000 series 

(sold separately)

SH-080529ENG

(1D7M24)

GT Designer3

Version1 Screen

Design Manual

(For GOT1000 Series)

(Fundamentals)

Describes methods of the GT Designer3 

installation operation, basic operation for 

drawing and transmitting data to 

GOT1000 series

(sold separately)

SH-080866ENG

(1D7MB9)

Bundled item

Quantity

GT10-LDR memory loader

1

USB cable (1m)

1

GT10-LDR Memory loader USER'S MANUAL (This manual)

1

1. Overview

GT10-LDR memory loader is the memory transfer module that reads/writes the data to GT10 or between a PC (GT Designer2 Ver.2.77F or later, GT Designer3 Ver.1.01B or
later) and GT10-LDR.

*1 When GT10-LDR is connected to a PC via the USB hub, the power supply of the   USB hub must be supplied by the AC adopter of the USB hub.

GT10-LDR connected to the USB hub may not work properly depending on the PC environment. In the case, connect the GT10-LDR directly to the USB port on the PC.

2. Specifications

2.1 General Specifications

*1 The wet bulb temperature is 39

C or less.

*2 Do not use or store the GOT under pressure higher than the atmospheric pressure of altitude 0m (0ft.). Failure to observe this instruction may cause a malfunction.

When the air inside the control panel is purged by pressurization, the surface sheet may be lifted by high pressure. As a result, the touch panel may be difficult to press,

and the sheet may be peeled off.

*3 This indicates the section of the power supply to which the equipment is assumed to be connected between the public electrical power distribution network and the

machinery within the premises. 

Category II applies to equipment for which electrical power is supplied from fixed facilities.

The surge voltage withstand level for up to the raged voltage of 300 V is 2500 V.

*4 This index indicates the degree to which conductive material is generated in the environment where the equipment is used.

In pollution degree 2, only non-conductive pollution occurs but temporary conductivity may be produced due to condensation.

2.2 Performance Specifications

*1 ROM in which new data can be written without deleting the written data.

Item

Specifications

Operating ambient temperature

0 to 40

C

Storage ambient temperature

-20 to 60

C

Operating ambient humidity

*1

10 to 90% RH, non-condensing

Storage ambient humidity

*1

10 to 90% RH, non-condensing

Vibration resistance

Conforms to JIS 

B3502 and 

IEC61131-2

Frequency

Acceleration

Half-amplitude

Sweep Count

Under intermittent 

vibration

5 to 9Hz

--

3.5mm

10 times each in X, Y 

and Z directions

9 to 150Hz

9.8m/s

2

--

Under continuous 

vibration

5 to 9Hz

--

1.75mm

9 to 150Hz

4.9m/s

2

--

Shock resistance

Conforms to JIS B3502, IEC 61131-2 (147 m/s

2

, 3 times each in X, Y and Z directions)

Operating atmosphere

Must be free of lamp black, corrosive gas, flammable gas, or excessive amount of electro conductive dust particles and must be no

direct sunlight. (Same as for saving)

Operating altitude

*2

2000 m (6562 ft) max.

Overvoltage category

*3

II or less

Pollution degree

*4

2 or less

Cooling method

Self-cooling

GT1020, GT1030

PC

(GT Designer2 Ver.2.77F or later

  GT Designer3 Ver.1.01B or later)

USB connecting
cable (supplied)

*1

Item

Specifications

Memory

User memory

*1

Flash ROM 7.5Mbyte

Life (Number of write 

times)

100,000 times

LED

POWER

green

SET/RUN

green/red/orange

ERROR

green/red/orange

Item

Specifications

Switch

RD/WR selection 

switch

Paddle switch

Data selection switch

ENT key

Tactile switch

The use of 100 thousand times is due for

replacement. 
(operating force 2.55N 

 0.69N)

Write protection switch

Slide switch

External dimensions

W70(2.75)

H110(4.33)

D21(0.82)[mm](inch)

Weight

0.2kg

2.3 Communication Specifications

2.4 Power Supply Specifications

3. External Dimensions

External Dimensions

Cable length

4. Part Name

Item

Specifications

GOT communication

Conforming to RS232

Transmission speed :115,200bps

Connector shape

: MINI DIN 6Pins (Male)

PC communication

Conforms to USB2.0 (Full speed is supported.)

(Performs the conversion between USB and serial in 

GT10-LDR. After serial conversion, transmission 

speed is 115.200bps.)

Connector shape

:USB MINI-B 5Pins (Receptacle)

Item

Specifications

Input power supply voltage

DC5V (DC4.75 to 5.25V)

Supplied from the GOT or PC (Supplied from bus 

power)

Fuse

-

Power consumption

0.7W (140mA/DC5V) or less

Unit: mm (inch)
Weight: 0.2kg

110 (4.33")

90 (3.54")

70 (2.75")

21 (0.82")

14 

(0.55")

Unit: mm (inch)

240 (9.44")

No.

Name

Specifications

1)

POWER LED

LED to show power status

2)

SET/RUN LED

LED to show that the settings are being checked/the transfer is running

3)

ERROR LED

LED to show error status

4)

RD/WR selection switch

Switch to select read/write direction

5)

Data selection switch

Switch to select the data to be transferred

6)

ENT key

Switch to determine the transfer direction and the data to be transferred, and to start the transfer

1)

2)

3)

12) 13)

6)

9)

10)

11)

14)

4)

5)

7)

8)

5. LED lighting specification

*1 An error message appears on the GOT screen. Apply remedies according to the display.

Refer to the "Chapter 12 Troubleshooting" for details on handling errors.

6. Switch operation specification

*1 When the standard monitor OS and communication driver are transferred from the memory loader to the GOT, starting up the GOT with OS installation screen is

required.

7)

Write protection switch

Switch to prevent the memory loader from being written to the data

8)

USB port

Connection port with a PC (with protection cap)

9)

Reference plate (operating instructions)

Described operating instructions of the memory loader

10)

Reference plate (error contents)

Described lighting status of ERROR LED

11)

Transfer cable

Cable to be connected with the GOT

12)

Strap hole

A hole to attach a strap

13)

Part to be labeled

Space to be labeled (created by user)

14)

Rating plate (Nameplate)

--

No.

Name

Specifications

LED Name

Status

Contents

POWER

POWER LED is lit.

Power is supplied.

POWER LED is not lit.

Power is not supplied.

SET/RUN

POWER LED is not lit.

Before starting the transfer. 

Orange light

The transfer direction and the data to be transferred are determined.

Green flashing

The transfer is running.

Green light

The transfer is completed.

Red flashing

The transfer is aborted.

ERROR

POWER LED is not lit.

No errors

Green light*

1

Write protection switch ON

Green flashing*

1

The GOT type that is set in the data to be transferred differs from that of the GOT to which the data is transferred.

Red light*

1

The data to be transferred is broken.

The major version of the standard monitor OS is different from that of the project data.

Red flashing*

1

Communication error occurs between the GOT and the memory loader.

Red

Green*

1

Password is set in the project data.

Orange

Green*

1

OS installation screen is not active

Switch Name

Specifications

RD/WR selection 

switch

Switch to select read/write direction

RD : The data is read out from the GOT to the memory loader.

WR : The data is written from the memory loader to the GOT.

Data selection switch

Switch to select the data to be transferred

When reading out the data from the GOT to the memory loader

[P OS] : The standard monitor OS, communication driver, project data, and resource data are read out from the GOT to the memory 

loader.

[PROJECT] : The project data and resource data are read out from the GOT to the memory loader.

When writing the data from the memory loader to the GOT

[P OS] : The standard monitor OS, font data, communication driver, and project data are written from the memory loader to the GOT.

[PROJECT] : The project data is written from the memory loader to the GOT.

Write protection switch

Switch to prevent the memory loader from being written to the data

ON : The data cannot be written neither from the GOT or a PC (GT Designer2, GT Designer3) to the memory loader.

OFF : The data can be written from the GOT or a PC (GT Designer2, GT Designer3) to the memory loader.

ENT key

Switch to determine the transfer direction and the data to be transferred, and to start the transfer

The transfer starts by pressing the key twice.

The first pressing of the key determines the read/write direction and the data to be transferred.

(After the read/write direction and the data to be transferred are determined, if RD/WR selection switch and Data selection switch are operated, 

the operations that have been made will be canceled.)

(The ENT key must be pressed within 30 seconds after the first pressing of the ENT key. Failure to do so cancels the operations that have been 

made.)

The second pressing of the key starts the transfer.

GT10-LDR Memory loader

User's Manual

This manual describes the part names, dimensions, mounting, and specifications
of the product. Before use, read this manual and manuals of relevant products
fully to acquire proficiency in handling and operating the product. Make sure to
learn all the product information, safety information, and precautions.
And, store this manual in a safe place so that you can take it out and read it
whenever necessary. Always forward it to the end user.
Registration
The company name and the product name to be described in this manual are the
registered trademarks or trademarks of each company.

Effective April 2015
Specifications are subject to change without notice.

 2007 MITSUBISHI ELECTRIC CORPORATION

Manual Number

JY997D29501F

Date

April 2015

Содержание GT10-LDR

Страница 1: ... Acceleration Half amplitude Sweep Count Under intermittent vibration 5 to 9Hz 3 5mm 10 times each in X Y and Z directions 9 to 150Hz 9 8m s2 Under continuous vibration 5 to 9Hz 1 75mm 9 to 150Hz 4 9m s2 Shock resistance Conforms to JIS B3502 IEC 61131 2 147 m s2 3 times each in X Y and Z directions Operating atmosphere Must be free of lamp black corrosive gas flammable gas or excessive amount of ...

Страница 2: ... Acceleration Half amplitude Sweep Count Under intermittent vibration 5 to 9Hz 3 5mm 10 times each in X Y and Z directions 9 to 150Hz 9 8m s2 Under continuous vibration 5 to 9Hz 1 75mm 9 to 150Hz 4 9m s2 Shock resistance Conforms to JIS B3502 IEC 61131 2 147 m s2 3 times each in X Y and Z directions Operating atmosphere Must be free of lamp black corrosive gas flammable gas or excessive amount of ...

Страница 3: ...T The standard monitor OS communication driver font data and project data are written from the memory loader to the GOT The operation procedure is described below 10 1 When the Data selection switch is PROJECT OS 1 Connect the memory loader to the GOT 2 Turn ON the GOT by pressing the lower right corner of the GOT The GOT startups with OS installation screen The OS can be transferred from GT Desig...

Страница 4: ...T The standard monitor OS communication driver font data and project data are written from the memory loader to the GOT The operation procedure is described below 10 1 When the Data selection switch is PROJECT OS 1 Connect the memory loader to the GOT 2 Turn ON the GOT by pressing the lower right corner of the GOT The GOT startups with OS installation screen The OS can be transferred from GT Desig...

Страница 5: ... Acceleration Half amplitude Sweep Count Under intermittent vibration 5 to 9Hz 3 5mm 10 times each in X Y and Z directions 9 to 150Hz 9 8m s2 Under continuous vibration 5 to 9Hz 1 75mm 9 to 150Hz 4 9m s2 Shock resistance Conforms to JIS B3502 IEC 61131 2 147 m s2 3 times each in X Y and Z directions Operating atmosphere Must be free of lamp black corrosive gas flammable gas or excessive amount of ...

Страница 6: ...T The standard monitor OS communication driver font data and project data are written from the memory loader to the GOT The operation procedure is described below 10 1 When the Data selection switch is PROJECT OS 1 Connect the memory loader to the GOT 2 Turn ON the GOT by pressing the lower right corner of the GOT The GOT startups with OS installation screen The OS can be transferred from GT Desig...

Отзывы: