26
WT07936X05
8. Test run
8-1. Collective operation ON/OFF
Confirm that the group settings and interlock settings are complete before performing a test run.
It may take approximately five minutes from power on until the local remote controllers become operable.
Refer to the indoor unit Installation Manual for details about a test run.
Note: Perform a test run in the presence of a customer.
Test run procedure
(1) Turn on the power to the EW-50 and all units.
(2) Make sure that the Power LED on the EW-50 is lit.
(3) Enter the web page address in the address field of the Web browser as follows:
http://[IP address of the login destination EW-50]/control/index.html
Note: The web page will be displayed in the same language as the operating system on the PC.
The web page can be displayed in other languages by entering the web page address as follows:
Chinese
http://[IP address of the login destination EW-50]/control/index.html?zh
English
http://[IP address of the login destination EW-50]/control/index.html?en
French
http://[IP address of the login destination EW-50]/control/index.html?fr
German
http://[IP address of the login destination EW-50]/control/index.html?de
Italian
http://[IP address of the login destination EW-50]/control/index.html?it
Japanese
http://[IP address of the login destination EW-50]/control/index.html?ja
Portuguese
http://[IP address of the login destination EW-50]/control/index.html?pt
Russian
http://[IP address of the login destination EW-50]/control/index.html?ru
Spanish
http://[IP address of the login destination EW-50]/control/index.html?es
Turkish
http://[IP address of the login destination EW-50]/control/index.html?tr
Note: For details, refer to section “Logging in from the PC/tablet” in the Instruction Book (Integrated Centralized Control
Web).
(4) Log in to the Integrated Centralized Control Web, and then open the [Monitor/Operation] screen.
(5) On the [Monitor/Operation] screen, click [Select all], click [ON], and then click [OK]. The group of units will start
an operation.
(6) On the [Monitor/Operation] screen, check the unit icons to see if the units are in operation.
(7) Check for the proper operation of each unit during the test run (e.g., check to see if cold (or warm) air comes out
of the supply air outlet on each indoor unit).
(8) After confirming that all units are operating properly, click [Select all] on the [Monitor/Operation] screen, click
[OFF], and then click [OK] to stop the units.
Содержание EW-50A
Страница 38: ...38 WT07936X05 ...
Страница 39: ...39 WT07936X05 ...
Страница 78: ...38 WT07975X03 ...
Страница 79: ...39 WT07975X03 ...