34
FTC4 Installation Manual
23
Ecodan
®
Installation
(continued)
Water Piping Work:-
WATER PIPING CONNECTION:
Connect the water pipes to the outlet and inlet pipes (ISO 228/1-G1B). Inlet and outlet pipes position is shown on
install the hydraulic filter at the water intake. Maximum allowance torque at the water piping connection is 50N/m
Check if water leaks after installation. Inlet water gauge pressure must be between 0-0.3MPa. Use the inlet water of
higher than 5°C and lower than 55°C.
+@;/A$/#A
Foundation Specification
Foundation bolt
M10 (3/8”)
Thickness of concrete
120mm
Length of bolt
70mm
Weight-bearing capacity
320kg
Содержание Ecodan HUS210FTC4ST
Страница 2: ......
Страница 8: ...5 Pipework Configuration 8 FTC4 Installation Manual ...
Страница 20: ...20 FTC4 Installation Manual 14 Ecodan Only System Schematic ...
Страница 46: ...46 FTC4 Installation Manual 24 Electrical Installation continued FTC4 Terminals N L FTC4 MASTER ...
Страница 83: ......