
10
5
WIRING DIAGRAM
PEFY-P30·54NMHU-E-F
G
S(SHIELD)
PARTS LOCATION
INSIDE SECTION OF CONTR
OL BO
X
AC250V
5A F
AC250V
6.3A T
( )
( )
F1
F2
2
1
1
2
CN23
CN24
CN25
CN27
1
3
5
FAN2
LED1
LED2
CN32
CN52
CN51
CN41
SW5
56
T
ZNR
CN82
CN62
SW4
CN42
4
3
2
1
4
3
2
1
7 8
TH23
2
1
CN29
8 7
1
2
3
4
5
6
A.B.
CN3T
3
1
SW1
SW2
SW3
TH22
REMOTE SENSOR
MF
LEV
L2
L1
65
17
8
8
9
4
3
3
1
3
3
2
2
2
4
4
3
3
1
1
1
3
1
1
1
1
6
5
4
3
2
1
CN81
CN20
CN21
CN60
CNT
CND
CNP
FAN3
XO1
XO5
XO6
XO4
I.B.
3
98
1
98
63
1
9
5
6
44
8
8
9
9
5
3
1
3
1
DP
1
2
A
S.B.
DSA1
CN1
1
3
ZNR1
SW14
(Connection No.)
SW11
(1st digit)
SW12
(2nd digit)
2
1
CN3A
3 1
M1
M2
CN2M
1
2
1
3
DS
CN31
CN31
21
CN22
1
2
TH24
SW7
Color/External static pressure
Red/High Blue/Low White/Middle
C
TB2
1 2
3 4 5
6
7
8
0
8
7
6
5
4
3
2
1
0
9
9
AB
C
D
E
F
1
9
0
2
3
4
6
5
7
8
TB5
TB15
]
Varistor
ZNR,ZNR1
Connector
CN27
Connector
CN25
Connector
CN24
Connector
CN23
NAME
SYMBOL
SW4(I.B.)
SW3(I.B.)
SW2(I.B.)
SW7(A.B.)
SW5(A.B.)
SW1(A.B.)
SW14(A.B.)
SW12(A.B.)
SW11(A.B.)
Power supply (Remote controller)
Power supply (I.B.)
LED2
LED1
Connector (Centrally control)
Connector (HA terminal-A)
Connector (Centrally control)
Connector (Remote indication)
CN52
CN51
CN41
CN32
NOTE;1.The part of the broken line indicates the circuit for optional parts.
2. A in the chart is the connector for a drain pump test run operation.
(The Drain Pump operates continuously if the connector is inserted
and the power is supplied.)
After the test run, make sure to remove the A connector.
3.The wirings to TB2,TB5,TB15 shown in chained line are field work.
4.Mark indicates terminal bed, connector, board insertion
connector or fastening connector of control board.
NAME
SYMBOL EXPLANA
TION
Power source terminal bed
Transmission terminal bed
TB5
TB2
Switch (1st digit address set)
Transformer
Address board
Indoor controller board
Electronic linear expan.valve
Capacitor (for MF)
Fan motor
LEV
T
A.B.
I.B.
C
MF
SYMBOL
<DP>
SYMBOL
NAME
TH22
TH23
Connector (Remote sensor)
CN20
X01,X04 X06
<F2>
F1
Fuse AC250V 6.3A T
Fuse AC250V 5A F
S.B.
Surge absorber board
Drain pump
TB15
Transmission terminal bed
Inside < > is the optional par
ts
.
TH24
<DS>
Drain sensor
*insert
I.B.
C
S.B.
TB2
A.B.
TB5,TB15
CONTROL BOX
Switch(for voltage selection)
attachment to alter the external static pressure on the fan
NOTE 1,2
NOTE 1
A connector is attached to the drain lift up mechanism, which is an optional part.
BREAKER(15A)
FUSE(15A)
PULL BO
X
T
O
NEXT INDOOR UNIT
TO DUCT
PO
WER SUPPL
Y
208V/230V 60Hz
Switch(for model selection)
Switch(for mode selection)
Switch (connection No.set)
Switch (2nd digit address set)
Switch(for capacity code)
Switch(for mode selection)
Thermistor (Piping temp.detection/gas)
Thermistor (Piping temp.detection/liquid)
Aux.relay
T
O
MA REMO
TE CONTR
OLLER
T
O
OUTDOOR UNIT
BC CONTR
OLLER
REMO
TE CONTR
OLLER
Thermistor (Outdoor air temp.detection)
Switch(for model selection)
NOTE 1
(Green)
(White)
(Yellow)
(Red)
(Yellow)
(Yellow)
(White)
(White)
(White)
(Red)
(Blue)
(White)
(Blue)
(Blue)
(Red)
(Green)
(Red)
(Red)
(White)
(White)
(White)
(Black)
(Red)
(Green)
(White)
(White)
(White)
(Blue)
(Red)
(White)
(TRANSMISSION TERMINAL
BED)
(TRANSMISSION TERMINAL
BED)
Pressure Pressure Pressure