Code

Working mode

L00

Load always active (DEFAULT)

L01

Sunlight control with switch off at sunset and switch on at sunrise (NIGHT 1)

L02

Sunlight control with switch switch off point after sunset (time adjustable) and switch on before 

sunrise (NIGHT 2)

In main loop "Input Current" interface, by long pressing (>3S) 

 

you can access secondary one-way loop.  In secondary loop, by 

short pressings 

    you  can  circulate  interfaces,  and  by  short 

pressing 

  you  can  change  values,  while  a  long-pressing 

n  main  loop  "Output  Current"  interface,  by  long  pressing(>3S) 

 you can access secondary one-way loop. In secondary loop, 

by short pressing 

 you can circulate interfaces, and by short 

pressin 

 you can change values, while a long-pressing (>S3)  

Different load controlling modes define parameters adjustable and interface displayed.

* period adjustable separately.

(>3 S) 

 enables data saving and exit, and a 20s absence of 

operation bring you to main loop interface with data unsaved.

Note: Only parameters of USr type are adjustable.

 enables data saving and exit, and a 20s absence of operation 

bring  you  to  main  loop  interface  with  data  unsaved.  3  working 

mode  for  load  as  below.  L00  is  the  default  working  mode  (load 

always active).

5.5 - Charging settings

5.6 - Load working mode

INPUT CURRENT

FLOAT CHARGE VOLTAGE

ABSORPTION

CHARGE VOLTAGE

EQUALIZED

CHARGE VOLTAGE

OUTPUT CURRENT

VOLTAGE OF LVD

LOAD-ON DURATION

BEFORE DAWN

VOLTAGE OF LVR

LOAD-ON DURATION

AT NIGHT

LOAD WORKING MODE

LOAD SWITCH-ON POINT

(SUNLIGHT LEVEL)

L00

mode DEFAULT

mode NIGHT 1

mode NIGHT 2

L01

on

on

on

off

off

L02

night*

dawn*

Содержание MOTORISATIONPLUS SOLAR

Страница 1: ...sation de portails et barrières Solar power kit for the automation of gates and barrier SOLAR Instructions et avertissements pour l installation et l usage Instructions and warnings for installation and use Instruções e advertências para a instalação e utilização ...

Страница 2: ... Installation du produit Support de montage du panneau solaire Panneau solaire Contrôleur de charge solaire Presse étoupes et câbles Câblage pag 9 pag 9 pag 9 pag 10 pag 10 pag 10 5 5 1 5 2 5 3 5 4 5 5 5 6 Mode d emploi Symboles Indications à l écran Réglage du type de batterie Paramétrage du numéro de série Paramètres de charge Mode de fonctionnement pag 10 pag 10 pag 10 pag 11 pag 11 pag 12 pag ...

Страница 3: ...apitre Caractéristiques techniques Ne pas effectuer l installation si ne serait ce qu un seul de ces dispositifs n est pas adapté à ce type d utilisation vérifier que les dispositifs achetés sont suffisants pour garantir la sécurité de l installation et son bon fonction nement effectuer l analyse des risques qui doit aussi com prendre la liste des exigences essentielles de sécurité contenues dans ...

Страница 4: ...s un écriteau indiquant MAINTE NANCE EN COURS tous les dispositifs doivent être raccordés à une ligne d a limentation électrique avec mise à la terre de sécurité le produit ne peut pas être considéré comme un système de protection efficace contre l intrusion Si vous souhaitez vous protéger efficacement il faut intégrer d autres dispositifs à l automatisme le produit ne peut être utilisé qu après l...

Страница 5: ...ie GEL SLD FLD and USr USB 5V 1A Interface utilisateur LCD 2 boutons Câblage Serrer 6mm2 Température de fonctionnement 20 50 C Température de stockage 30 60 C Humidité ambiante 10 90 sans condensation Dimensions de la boîte mm 316 L 396 A 188 P Poids boîte sans piles 3 kg Ajouter 25 kg pour le poids approx des batteries Indice de protection IP 56 2 3 Caractéristiques techniques Kit d alimentation ...

Страница 6: ...ype GEL Pour les barrières le système n est pas compatible avec les LED de la lisse Les disques LED sur le corps de la barrière doivent être utilisés en mode clignotant Pour une configuration correcte voir les instructions de l unité de contrôle Les accessoires consomment plus d énergie de la batterie plus vous connectez d accessoires plus le système aura besoin d énergie Charge égalisée Charge d ...

Страница 7: ...mateur secteur en même temps fig 6 ATTENTION Exemple d installation avec SLD 400 avec système NLS actif et inactif lumière de courtoisie sur capot moteur Pour le calcul 10 heures d ensoleillement ont été prises en compte Bien que notre système puisse fonctionner pendant plus de 30 cycles et ou fournir plus d une semaine de fonctionnement en veille avec des batteries complètement chargées il a beso...

Страница 8: ...LUMI24 Clignotant seulement SAFEDUO Cellule photoélectrique TX RX NLS MODÈLE DESCRIPTION LED Couvercle du moteur bande led Heures de travail quotidiennes en heures Nc Nombre de cycles quotidiens Temps de mouvement ES 48 1 0 8 heures 60 60 Temps de veille journalier pendant que le portail est OUVERT en heures Nc Nombre de cycles quotidiens Temps de pause ES 30 48 0 4 heures 3600 3600 Temps de veill...

Страница 9: ...support utiliser deux chevilles M8 sur le point de fixation fig 3 2 et des rondelles et écrous pour fixer le panneau LATITUDE Angle d inclinaison α 0 15 15 15 25 même valeur que la latitude 25 30 Ajouter 5 à la latitude 30 35 Ajouter 10 à la latitude 35 40 Ajouter 15 à la latitude 40 Ajouter 20 à la latitude L angle d inclinaison est une moyenne pour toutes les saisons Pour des angles d inclinaiso...

Страница 10: ...e la batterie détectée par la centra le Courant nominal courant nominal de charge et de décharge de la centrale ATTENTION Ne jamais utiliser le panneau solaire et le transformateur ac en même temps fig 6 Motorisation Plus recommande fortement d utiliser les spécifications suivantes pour les câbles 1 et 2 fig 5 la carte Connecter la batterie à la centrale et vérifier que l afficheur est allumé sino...

Страница 11: ...nu secondaire unidirection nel Dans le munù secondaire en appuyant brièvement vous pouvez commencer la navigation Pour quitter le menu appuyez et maintenez 3s ou aucune opération pendant 20 secondes de fonctionnement Ah Battery Discharge Meter par un appui long 3s les données sont supprimées Dans l interface Tension batterie en appuyant longuement et simultanément jusqu à ce que l écran soit compl...

Страница 12: ...modes de fonctionnement de charge définissent les paramètres réglables et l interface affichée la durée peut être réglée séparément 3s permet l enregistrement et la sortie des données et une absence d opérations pendant 20 secondes conduit à l interface du menu principal avec des données non enregistrées Remarque seuls les paramètres de type USr sont réglables 3s cl envoi de données d enregistreme...

Страница 13: ...nneau solaire Assurez vous que la tension en circuit ouvert n est pas trop élevée E07 Charge désactivée par le contrôleur en raison d un courant de panneau solaire excessif Vérifiez la puissance du panneau solaire et réduisez la quantité de panneau solaire en connexion parallèle et attendez 2 minutes pour redémarrer la charge Symptômes Chèques L écran LCD n est pas actif Vérifiez la connexion des ...

Страница 14: ...4 2 4 3 4 4 4 5 Installing the product Solar panel mount bracket Solar panel Solar charge controller Cable and cable glands Wiring pag 21 pag 21 pag 21 pag 22 pag 22 pag 22 5 5 1 5 2 5 3 5 4 5 5 5 6 Operating Instruction Symbols LCD Interfaces Battery communication Controller SN Charging settings Load working mode pag 22 pag 22 pag 22 pag 23 pag 23 pag 24 pag 24 6 6 1 6 2 Troubleshooting Error cod...

Страница 15: ...not suitable for its intended purpose check that the devices purchased are sufficient to gua rantee system safety and functionality perform a risk assessment including a list of the es sential safety requirements as envisaged in Annex I of the Machinery Directive specifying the solutions adopted The risk assessment is one of the documents included in the automation system s technical file This mus...

Страница 16: ...uced physical sensory or mental capabilities or lack of experience and knowledge if they have been given supervision or instruction concerning use of the appliance in a safe way and understand the hazards involved before starting the automation system ensure that there is no one in the immediate vicinity before proceeding with any cleaning or maintenance work on the automation system disconnect it...

Страница 17: ... Man machine interface LCD 2 buttons Wiring PCB terminal 6mm2 Working temperature 20 50 C Storage temperature 30 60 C Working humidity 10 90 no condensation Plastic box dimension mm 316 L 396 A 188 P Weight box without batteries 3 kg Add 25kg for the approx batteries weight Degree of protection IP 56 2 3 Technical characteristics Solar powered kit for the automation of gates and barrier gates fig ...

Страница 18: ...es For barriers ALT3 4 6 do not connect LED lights on boom and disconnect double colour led discs on the barrier only possible to connect RED led with flashlight function See instruction of barrier control unit Accessories will draw additional power from the battery the more accessories you connect the more power your system will require Equalized charge Absorption charge Float charge Bulk charge ...

Страница 19: ...barrier control unit ATTENTION Never use the solar panel and the ac transformer at the same time fig 6 ATTENTION Example of installation with SLIDER and with 12 hours Night Light System NLS cover LED strip and without Night Light System While our system can operate over 30 cycles and or provide over 1 week of standby time on fully charged batteries it needs enough standby time to fully recharge th...

Страница 20: ...4X Radio receiver LUMI24 only FLASHLIGHT SAFEDUO Pair of photocells TX RX NLS MODEL DESCRIPTION LED strip motor cover Daily working time in hours Nc Number of cycles day Moving time ES 48 1 0 8 hours 60 60 Daily standby time while gate is OPEN in hours Nc Number of cycles day Pause time ES 30 48 0 4 hours 3600 3600 Daily standby time while gate is CLOSE in hours 24 hours Daily working time in hour...

Страница 21: ...nt bracket par 3 on fixed flat or pole mount Firmly fix the panel to avoid loosening causing incorrect tilt angle According to the installation latitude the panel should be tilted with respect to the ground with an angle α fig 4 which must be calculated based on the following table check that when operated by hand the gate moves smoothly without any areas of greater friction or derailment risk chec...

Страница 22: ...d condition System voltage battery voltage detected by controller Rated current Rated charging and discharging current of controller ATTENTION Never use the solar panel and the ac transformer at the same time fig 6 Motorisation Plus strongly suggest to use the following specification for the cable 1 and 2 fig 5 Connect battery to controller and check whether the LCD display is on if not please sol...

Страница 23: ...you can access secondary one way loop In secondary loop by short pressing you can circulate interfaces and a long pressing 3S or a 20s absence of operation you can exit Meter or Ah Battery Discharge Meter by long pressing 3S data is cleared In Battery voltage interface by long pressing and simultaneously until the screen is fully bright controller is restored to factory defaults ATTENTION Set the ...

Страница 24: ...nge values while a long pressing S3 Different load controlling modes define parameters adjustable and interface displayed period adjustable separately 3 S enables data saving and exit and a 20s absence of operation bring you to main loop interface with data unsaved Note Only parameters of USr type are adjustable enables data saving and exit and a 20s absence of operation bring you to main loop int...

Страница 25: ...ched off by controller due to excessive solar panel current Check power of solar panel and reduce solar panel quantity in parallel connection and wait for 2 mins for restart charging Symptoms Checks No sign on LCD initialization Make sure no reverse connected battery and connection between battery and controller is good make sure circuit of battery switched on and fuse protector connected No charg...

Страница 26: ...dle part of the PV module frame using M8 module bolts and M8 mounting bolts along with washers lock washers and nuts CAUTION Additional mounting holes may be required if using this mount with a panel other than the Solarland SLP series Great care should be taken when drilling additional holes as damage to the panel can easily occur rending it useless Step3 To adjust the tilt angle of the PV panel ...

Страница 27: ...sformatore ac allo stesso tempo Non collegare il cavo 2 nel connettore della batteria Collegare solo all alimentazione EN Never use the solar panel and the ac transformer at the same time Do not connect cable 2 into battery connector Only connect to power supply FR Ne jamais utiliser le panneau solaire et le transformateur ac en même temps Ne pas brancher le câble 2 dans le connecteur de la batter...

Страница 28: ...N SIERRA LEON 17 HARARE ZIMBABWE 14 KABWE 0 KAMPALA UGANDA 12 KANO NIGERIA 15 KHARTOUM SUDAN 4 KINSHASA NDJILI ZAIRE 4 KINSHASA NDOLO ZAIRE 0 KISANGANI ZAIRE 6 LAGOS NIGERIA 28 PALMAS DE GC 10 LINDI TANZANIA 12 LOBITO 6 LOME TOGO 11 LUBUMBASHI ZAIRE 26 LUDERITZ SOUTH AFRICA 4 LUZAMBA ANGOLA 25 MAPUTO MOZAMBIQUE 29 MASERU LESOTHO 1 MBALA ZAMBIA 2 MOGADISHU SOMALIA 6 MONROVIA LIBERIA 7 MWANZA TANZAN...

Страница 29: ...ESTER PA 42 LANSING MI 27 LAREDO TX 36 LAS VEGAS NV 42 LAWRENCE MA 38 LEXINGTON KY 40 LIMA OH 41 LINCOLN NE 34 LITTLE ROCK AR 34 LOS ANGELES CA 38 LOUISVILLE KY 42 LOWELL ME 33 LUBBOCK TX 33 MACON GA 43 MADISON WI 43 MANCHESTER NH 32 MARSHALL TX 35 MEMPHIS TN 41 MERIDEN CT 26 MIAMI FL 43 MILWAUKEE WI 45 MINNEAPOLIS MN 48 MINOT ND 30 MOBILE AL 32 MONTGOMERY AL 44 MONTPELLIER VT 40 MUNCIE IN 36 NASH...

Страница 30: ...30 ...

Страница 31: ...31 ...

Страница 32: ...580SOLARMO REV 00 Instruction version LABEL HABITAT SAS rue Léo Lagrange 10 27950 Saint Marcel France Téléphone 33 02 32 21 21 63 www motorisationplus com ...

Отзывы: