
9
Installation –
Mounting the Hood
Hood is intended to be mounted to a fi nished ceiling.
1.
Ceiling Preparation:
Determine hood mounting location and temporarily tape paper template (incluided with the
hood) to the ceiling. Cut-out internal shaded area of template to allow the ductng and electrical to pass through
(approx. 7”W x 7-
1/2
”D). Add wood blocking (min. 2” x 4”) onto ceiling joists to refi nforce ceiling above the drywall.
(FIG. A, #1) Secure (2) 1-
1/2
” wood screws into points A and B of the paper template (FIG. B). Do not completely
tighten screws, leave approx. 1/4” exposed.
2.
Hood Preparation:
Remove screws securing top and bottom support frames together. Adjust support frame to
accomodate the desired hood height and re-assemble the frame using the previously removed screws (2 screws
for each support frame arm). (FIG. A, #2)
3. Lift support frame assembly up to the ceiling making sure the the word “front” on the top support frame faces the
front of the hood where the controls will be located (FIG. C). The key-holes on the top support frame should cover
the wood screws previously installed in the ceiling. Slide support frame towards narrow end of key-holes to lock
the frame in place.
4. Install the last (2) 1-1/2” wood screws into the two remaining corners of the top support frame to secure it to the
ceiling. Tighten all screws.
3
1
2
6
5
4
Ceiling Joists
Wood Blocking
Top Support Frame
Bottom Support Frame
Hood Body/Canopy
front
A
B
Front of Hood
C L
/
Cut-Out Shaded Area
FIG. A
FIG. C
FIG. B
FRONT
WARNING: Electrical wiring must be done by a qualified person(s) in
accordance with all applicable codes and standards. This range hood must be
properly grounded. Turn off electrical power at service entrance before wiring.
!
PAPER TEMPLATE
Содержание MH00436G
Страница 1: ...Installation Use and Care Guide 2014 SEP READ AND SAVE THESE INSTRUCTIONS MODEL MH00436G ...
Страница 2: ...www build com ...
Страница 19: ...17 Wiring Diagrams MH00436G ...