4.0 Operation
WARNING
Internal maintenance must be
performed with a transformer de-
energized, isolated and with the
terminals grounded.
Caution:
Do not remove covers, panels, or any
enclosure parts while the
AUTOTRANS
L
INEATOR
™
is
energized.
4.1 Effect of Humidity
While the
AUTOTRANS
L
INEATOR
™
is energized,
humidity conditions are generally not important
since the heat from the reactor will prevent
condensation. If a shutdown exceeding 24 hours
occurs during a period of high humidity that could
cause condensation within the transformer,
precautions should be taken. Small strip heaters
may be energized in the bottom of the unit to
maintain the temperature of the unit a few degrees
above that of the outside air. If such precautions
are not taken the unit should be inspected for
evidence of moisture and insulation resistance
checked. If necessary, dry as described in
Maintenance section above.
4.2 Loading
A
AUTOTRANS
L
INEATOR
™
should only be loaded in
accordance with its nameplate rating.