Mirolin S36 Скачать руководство пользователя страница 4

PREPARATION

"

Build solid framing to the dimensions in Figure 1.

"

Ensure that the floor is level, correct if necessary.

"

Location of Mirolin supplied drain for shower stalls is
shown in Figure 1, to be assembled as in Figure 7.

"

Drain pipe must be vertical.

"

Trim drain pipe as required to meet drain assembly.

"

Place the unit into position and plumb vertical, shim if
necessary.

"

Dry fit drain to check position. Refer to figure 7.

"

Mark and drill 1/4” pilot holes for plumbing fixtures.

"

Verify that the holes are in the right location.

"

From the finished side of the unit use the correct size
hole saw to cut the openings, using the pilot holes as
guides.

"

Remove the unit and cement the drain body into
place.

INSTALLATION

"

Carefully position the shower into the framing and
push flush against the framework walls.

"

Install the drain according to the manufacturer’s
instructions. Use a mildew resistant silicone
bathroom caulking to seal the drain to the top surface
of the shower.

"

Drill and countersink 1/8” holes on the flanges. 10 on
each side and 4 across the top. Refer to Figure 3.

"

Fasten the acrylic unit to the framing using drywall
screws. Note that over tightening or burying the head
of the screw will cause the acrylic to crack.

"

Apply silicone caulking over the head of the screws
and around the openings for the fittings when they
are installed.

"

Finish with drywall as shown in Figure 4 or 5.

"

After installation is complete, remove the protective
film from the front of the acrylic shower unit.

INSTALLATION CLEAN-UP

It is important to remove all construction debris and foreign
materials.
Remove construction dirt and residue with a mild liquid

detergent. DO NOT USE abrasive cleaners, scouring
compounds and pads, metal scrapers, steel wool, or other
materials that could damage or dull the surface of the
shower.
Remove plaster carefully

with a blunt wooden block

having rounded edges.
Remove paint and other stubborn stains with isopropyl
(rubbing) alcohol.
DO NOT USE products such as acetone ( nail polish
remover), dry cleaning solution, lacquer thinners,
gasoline, pine oil, etc.
Test the installation after completing the plumbing, but
before enclosing the shower stall and finishing the
surroundings.

MAINTENANCE

The acrylic sheet which forms the surface of your shower
provides one of the most durable

surfaces found in

modern bathrooms. Keep it bright and smooth with mild
liquid household detergent, soap and water, or foaming
cleansers. NEVER USE aromatic solvents, abrasive
cleaners, scouring compounds or pads, strong liquid
cleansers, or other material that could damage or dull the
surface of the bath.
We recommend the use of Mirogloss Acrylic and

®

Fiberglass Polish before use and then periodically to
preserve the appearance of your bath. Mirogloss Acrylic

®

and Fiberglass Polish is available from your dealer.

Restoring Surface Gloss.

Restore surface gloss by

applying a very fine rubbing compound and polishing the
surface by hand or with a power buffer. Finish with an
application of Mirogloss or a good quality automotive

®

wax.

Minor Repairs to Surface.

Remove minor scratches and

scuffs as follows. First, wet sand the area with 600 grit wet
sandpaper until the surface is smooth. Then, restore the
gloss as described under RESTORING SURFACE
GLOSS.

We want you to be completely satisfied with our products and service. If you have any comments or suggestions, please call

1-800-MIROLIN

toll free.

The company reserves the right to change models

and specifications without notice.

Customer Service:

(416) 231-5790

Canada, U.S.A: 1-800-361-9841

Fax, Canada: 1-800-463-8101

60 Shorncliffe Rd., Toronto, Ontario M8Z 5K1

Telephone: (416) 231-9030  -  Fax: (416) 231-0929

4

R

TM

84 152

09/07

8-4

Содержание S36

Страница 1: ...ent room on one side or the other the flange may notched at the bottom and recessed into the stud wall Figure 4 shows flush fitting and Figure 5 shows recess fitting Three Piece Units To facilitate moving through doorways 3 piece units may be taken apart On the S363 and S483 L R units remove the 4 wood blocks on the side flange before installation they are for shipping only Use the pre drilled hol...

Страница 2: ...E 2 ABS PIPE FIGURE 5 RECESS FITTED FIGURE 7 SHOWER DRAIN ASSEMBLY 3 piece units S483 L R 81 1 4 48 25 36 16 1 4 19 7 39 1 2 7 1 2 8 1 4 36 19 34 16 1 4 3 piece units S363 81 1 4 18 8 40 9 6 1 4 1 x 2 WOOD REQUIRED FOR 3 PC UNIT 1 x 2 WOOD REQUIRED FOR 3 PC UNIT FIGURE 2a LAYOUT DIMENSIONS FOR S363 FIGURE 2b LAYOUT DIMENSIONS FOR S483 L R ...

Страница 3: ...FIGURE 8 LATCH IN OPEN POSITION FIGURE 9 LATCH IN LOCKED POSITION LATCH ASSEMBLY INSTRUCTION ACRYLIC SHOWER STALLS THREE PIECE UNITS S363 S483 L R 3 UNLOCKED LOCKED ...

Страница 4: ...l or other materials that could damage or dull the surface of the shower Remove plaster carefully with a blunt wooden block having rounded edges Remove paint and other stubborn stains with isopropyl rubbing alcohol DO NOT USE products such as acetone nail polish remover dry cleaning solution lacquer thinners gasoline pine oil etc Test the installation after completing the plumbing but before enclo...

Страница 5: ...tant mural La figure 4 montre l installation de niveau et la figure 5 illustre l installation en retrait Cabines à trois sections Pour faciliter le déménagement par les embrasures 3 démontage d unités de morceau Sur l unité S363 S483 L R et il faut retirer les quatre blocs de bois de la bride latérale avant l installation ils ne servent qu à l expédition Utiliser les trous pré entraînés sur chaque...

Страница 6: ...IMENSIONS DE L INSTALLATION DU S363 FIGURE 2b DIMENSIONS DE L INSTALLATION DU S483 L R Trois sections S363 81 po 1 po x 2 po le bois a exige le 3 pc unites 1 po x 2 po le bois a exige le 3 pc unites Trois sections S483 L R 81 po ÉCROU DU DRAIN BASE DE DOUCHE JOINT EN CAOUTCHOUC JOINT EN CARTON CORPSE DU DRAIN Appliquer de la silicone avant la pose finale TUYAU EN ABS DE 2 PO FIGURE 7 MONTAGE DU DR...

Страница 7: ...OQUET DANS LA POSITION OUVERTE FIGURE 9 FERMER AU LOQUET DANS LA POSITION FERMÉE À CLEF FERMER AU LOQUET L INSTRUCTION D ASSEMBLÉE CABINES DE DOUCHES EN ACRYLIQUE TROIS UNITÉS DE MORCEAU S363 S483 L R 3 OUVERT FERMÉ À CLEF ...

Страница 8: ...ntes à l aide ealoeol isopropyle alcool à frottement NE PAS UTILISER de produite tels que de l acétone dis solvant de vernis à ongles de solution de nettoyage à sec de diluanta à laque d essence d huile de pin etc Vérifier Finstallation une fois la plomberie terminée mais avant que la baignoire ne Boit complètement entourée et que Von ait terminé la fuùtion des parties voisines p Remplir la baigno...

Отзывы: