STEP 7: Insert the Door Tracking Guides (B9A,
B9B, B9C), one at each end and centre the middle
one where doors will meet.
STEP 9: Place the Aluminum Wall Jamb (B1)
over the Plastic Jamb (B2) and insert from the
bottom to top.
6
STEP 10: Make sure the pre-drilled holes in the
Aluminum Jamb (B1) line up with the Adjustment
Blocks (B11).
STEP 11: Insert Sill (B10) into the Wall Jamb (B1).
NOTE:
If the sill is too long, measure the length
required and cut with hacksaw 1/8” less than
measurement.
STEP 12: Make sure the Wall Jamb (B1) rests on the
small lip of the Sill (B10) as shown on the picture.
STEP 8: Using a 1/8” bit drill holes in each guide.
Screw guides in place 3” from each end and in the
centre of the sill.
3”