Mira Vie Скачать руководство пользователя страница 2

Thank you for choosing a Mira shower. To enjoy the full 

potential of your new shower, please take time to read this 

guide thoroughly, and keep it handy for future reference.

Products manufactured by Kohler Mira Ltd are designed to be 

safe, provided that they are installed, used and maintained in 

good working order, in accordance with our instructions and 

recommendations.
Follow all warnings, cautions and instructions contained in 

this guide, and on, or inside the shower. This guide is also 

available in electronic format on our website or by contacting 

customer services.
This product has separate controls for power selection and 

for  temperature/flow  adjustment. A  unique  flow  regulator 

stabilises any temperature changes caused by water pressure 

fluctuations, which can result from taps being turned on or off 

or toilets being flushed.

INTRODUCTION

IMPORTANT SAFETY INFORMATION

Documentation

1 x Electric Shower

1 x Installation Guide

1 x User Guide

1 x Guarantee Brochure

PACK CONTENTS

INSTALLATION REQUIREMENTS

Plumbing and Electrical Schematic

1.  Installation of this shower must be carried out in 

accordance with these instructions by qualified, 

competent personnel. 

2.  Isolate the electrical and water supplies before 

SPECIFICATION

European Conformity Information

This range of electric showers complies with the following 

European directives:

2006/95/EC Low Voltage Directive, 2004/108/EC EMC 

Directive

, 2011/65/EU RoHS Directive

This range of electric showers are high power appliances and 

are subject to conditional connection. If the main electrical 

supply fuse is rated less than 80 Amps, the local electricity 

supply company must be contacted to confirm if the electrical 

supply is adequate. 
This range of showers complies with the requirements of the 

UK’s water regulations.

PLUMBING

1.  The plumbing installation must comply with all national 

or local water regulations and all relevant building 

regulations, or any particular regulation or practice 

specified by the local water supply company.

2.  Do not install the product in a position in which service 

access is limited.

3.  Decide on a suitable position for the shower (minimum 

distance of 200 mm from the ceiling to allow for cover fit 

and removal).

4.  The shower is suitable for installation within the shower 

area and is fitted with a pressure relief valve. It must be 

positioned over a water catchment area with the controls 

at a convenient height for the user.

5.  The shower must be fitted to a waterproof flat and even 

wall surface.

6.

  DO NOT

 fit the shower to the wall and tile up to the case.

7.

  DO NOT

 seal the gap between the shower and the wall 

surface.

8.  The showerhead should be positioned so that it 

discharges down the centre line of the bath or across 

the opening of a shower cubicle.

9.  The showerhead must be directed away from the shower 

unit, during normal use the showerhead must not spray 

directly on to the shower unit.

10.

  DO NOT

 apply excessive force to plumbing connections; 

always provide mechanical support when making 

plumbing connections. Any soldered joints should be 

made before connecting the shower.

11.  The  position  of  the  shower  and  shower  fittings  must 

provide a minimum gap of 25 mm between the 

showerhead and the spill over level of any bath, shower 

tray or basin and a minimum gap of 30 mm between the 

showerhead and the spill over level of any toilet, bidet or 

other appliance with a Fluid Category 5 backflow risk.

Zone of 

Backflow Risk

30 mm 

Minimum

Toilet or Bidet 

FC5

Hand Basin 

FC3

Bath or Shower 

Tray FC3

Electric 

Shower

25 mm 

Minimum

25 mm Minimum

Hose retaining ring fitted and shower fittings fixed at a 

suitable height preventing dirty water backflow.

Note! 

There will be occasions when the hose retaining 

ring will not provide a suitable solution for Fluid Category 3 

installations, in these instances an outlet double checkvalve 

must be fitted, this will increase the required supply pressure 

typically by 10kPa (0.1 bar). Double checkvalves fitted in the 

inlet supply to the appliance cause a pressure build up, which 

affect the maximum static inlet pressure for the appliance and 

must not be fitted. For Fluid category 5 double checkvalves 

are not suitable.
12.  This shower is not designed to be plumbed directly from 

the rear. For rear-entry supply, add an elbow to the supply 

pipe and connect as a rising or a falling supply.

13.  If pipework and/or electrical cables enter the shower from 

the rear through a hole in the wall provision must be made 

to prevent water ingress back into the wall structure. 

14.  This shower is intended to be permanently connected 

to the mains water supply, only use the inlet connection 

supplied with the shower. 

 

DO NOT

 use any other type of fitting.

15.  A full bore/non restrictive servicing valve must be fitted 

in a readily accessible position adjacent to the shower 

to facilitate maintenance of the shower. 

DO NOT

 use a 

valve with a loose washer plate (jumper) as this can lead 

to a build up of static pressure.

16.  A water treatment device should be installed where the 

ELECTRICAL 

1.  The electrical installation must comply with BS 7671 

(commonly referred to as the IEE Wiring Regulations) 

and all relevant building regulations, or any particular 

regulation or practice specified by the local electricity 

supply company.

2.  Ensure that all circuit protection devices, switches and 

cabling is adequate for the rated current of the shower 

and that the rating of the electricity supply company fuse 

and the consumer unit are adequate for the additional 

demand.

3.  The shower 

must

 be earthed. Ensure any supplementary 

bonding complies with the relevant regulations.

4.  This shower is intended to be permanently connected to 

the fixed electrical wiring of the mains system. A separate 

supply 

must

 be provided from the consumer unit to the 

shower.

5.

  DO NOT 

supply any other electrical equipment including 

extractor fans or pumps via this product.

6.  This shower must be provided with means for local 

disconnection that is incorporated into the fixed wiring 

in accordance with the relevant local wiring regulations. 

This 

must

 be a double pole switch, which has at least  

3 mm contact separation in each pole. The switch can 

be a ceiling mounted pull-cord type within the shower 

room or a wall mounted switch fitted in the applicable 

zone area.

7.  For new installations a 30mA Residual Current Device 

(RCD) must be incorporated into the electrical supply 

to this shower in accordance with current wiring 

regulations. When replacing an existing electric shower 

we recommend that a 30mA RCD be incorporated in 

accordance with current wiring regulations if not already 

provided 

8.

  DO NOT 

apply excessive force to the terminal block.

9.  All electrical connections should be checked for tightness 

to prevent overheating before switching on the electrical 

supply.

10.

  DO NOT 

switch on the electrical supply until the plumbing 

has been completed and checked for leaks.

water hardness may exceed 200 ppm. Malfunctions 

caused by excessive limescale formation are not covered 

by this shower’s guarantee (see back page for details).

17.  The installation must not cause the hose to be sharply 

kinked during normal use.

18.

  DO NOT

 perform the electrical installation until the 

plumbing has been completed and checked for leaks.

Dimensions

Height

329 mm

Width

220 mm

Depth

101 mm

1 x Installation Template (printed on 

the inside of product carton)

INSTALLATION

Remove the three screws 

that hold the cover on 

and remove the cover.

Cover

Screw

Screws

Determine the direction and route of the incoming 

water supply: 

2

4

6

Inlet 

Supply

Pushfit 

Elbow

Inlet 

Connector

8

Cover

Screw

Screws

9

Ensure the control dials 

are aligned with the 

spindles and replace the 

cover.
Tighten the three cover 

screws.

Do not

 use alternative 

screws to secure the 

cover. This can cause 

internal damage to the 

appliance.

Warning! 

Isolate the electrical and water supplies before 

installing the shower.

Use the Installation Template provided (printed on the 

product carton), together with a spirit level to mark the 

positions of the 

three 

fixing holes.

Note! 

The shower should be positioned at least 

200 mm from the ceiling. Ensure that there are 

sufficient lengths of supply pipe and electrical cable to 

reach the connection points as shown on the template.

Drill three holes to suit the fixing screws and wall 

plugs. 

Caution!

 Do not drill into cables or pipes in the wall.

1

For falling or rising 

supplies the cover has 

thinned sections on the 

top and bottom that can 

be removed to allow entry 

of the supply pipe and 

electrical cables.

3

Note! - DO NOT

 use an incoming supply entering the 

shower directly from the back. Add an elbow to the 

supply pipe and connect it as a rising or falling supply.

Thoroughly flush the supply pipe.

5

Secure the shower to the wall with fixing screws and 

wall  plugs  (supplied)  or  appropriate  wall  fixings  for 

your installation.

Connect the inlet supply 

pipe to the inlet connector 

using  a  push  fit  elbow  or 

an elbow with compression 

nuts and olives.

Important!

 Do Not use 

push fit elbows that require 

specialist tools for removal. 

Access to the inlet filter is 

required periodically and 

so any connector needs 

to easily removed for 

maintenance.

Note! 

When making 

connections to the shower 

Do Not use jointing paste 

products as damage to the 

shower will occur.

Turn on the water supply 

and check connection for 

leaks.

Strip back sufficient outer 

cable insulation to enable 

routing to terminal block. 
Insert the wires into the 

terminal block.
Tighten the screws in the 

terminal block, ensure the 

wires are secure and tight.
Ensure the earth bonding 

complies with relevant 

regulations.

(Live) = Brown wire

 

(Protective Earth) = Green / Yellow sleeved wire

N

  (Neutral) = Blue wire

7

10

Do not seal around the back of appliance

.

Install the shower fittings (Refer to the Shower 

Fittings Installation and User Guide packed with the 

product).

The shower must be commissioned before use, 

please refer to section: 

‘COMMISSIONING’

.

This completes the installation.

11

12

13

Thinned 

Section

Falling

 

(entering the shower 
from the top).

 

Rising

(entering the shower 

from the bottom). 

Electrical and electronic devices contain a range of 

materials that can be separated for recycling and 

used in new products. 

1 x Component Pack

1 x Showerhead

1 x Hose

1 x Shower Fittings

This shower should not be disposed of with your general 

household waste. When this shower has reached the end of 

its serviceable life please take it to a recognised WEEE (Waste 

Electrical and Electronic Equipment) collection facility such 

as your local civic amenity site for recycling.
Your local authority or retailer will be able to advise you of 
your nearest collection facility.

Mira Electric Showers covered by this guide:

WARNING  –  This  shower  can  deliver  scalding  temperatures, 

cause fire, electric shock or other personal injury if not installed, 

operated  or  maintained  in  accordance  with  the  instructions, 

warnings and cautions contained in this guide and on or inside 

the appliance.
Please read the important safety information and the installation 

requirements detailed in this guide before installing the shower.

Failure to follow the instructions provided with this shower will 

invalidate the guarantee.

TO REDUCE THE RISK OF FIRE, ELECTRIC SHOCK OR INJURY:

commencing installation. The electricity must be isolated 

at the consumer unit and the appropriate circuit fuse 

removed, if applicable. Mains connections are exposed 

when the cover is removed.

3.

  DO NOT

 install the shower in areas with high humidity 

and temperature (i.e. steam rooms and saunas).

4.

  DO NOT

 install the shower where it may be exposed to 

freezing conditions. Ensure that any pipework that could 

become frozen is properly insulated.

5.

  DO NOT 

switch the shower on if there is a possibility 

that the water in the shower is frozen. 

6.

  DO NOT

 switch the shower on if water starts leaking 

from the shower case. Isolate the electrical supply to 

the shower immediately.

7.

  DO NOT

 connect the outlet of the shower to any tap, 

control valve, trigger operated handset or showerhead 

other than those specified for use with this shower. Only 

Kohler Mira recommended accessories should be used.

8.  The water supplies to this product must be isolated if 

the product is not to be used for a long period of time. If 

the product or pipework is at risk of freezing during this 

period they should also be drained of water.

9.

  DO NOT

 perform any unspecified modifications,or drill 

or cut holes in the product other than instructed by this 

guide. When servicing only use genuine Kohler Mira 

replacement parts.

10.  If the shower is dismantled during installation or servicing 

then upon completion the product must be inspected to 

ensure all electrical connections are tight and that there 

are no leaks.

11.  Read all installation instructions before installing this 

shower.

12.  Upon completion of the installation, make sure that the 

user is familiar with the operation of the shower, and 

leave this guide and the user guide with the owner.

Electrical

Variant

7.5

8.5

9.5

10.8

Nominal Power at 240 V ac

7.5 kW

8.5 kW

9.5 kW 10.8 kW

Nominal Power at 230 V ac

6.9 kW

7.8 kW

8.7 kW

9.9 kW

Recommended MCB Rating

32 A

40 A

45 A

Max Supply Cable Size

16 mm²

Recommended RCD Rating

30 mA tripping current

Recommended Isolator Switch

45 A double-pole with 3 mm contact 

separation

Appliance Sealing Rating

IP X4 - Suitable for installation in 

Zone 1

Max Ambient Temperature

30°C

Min Ambient Temperature

2°C

Plumbing

Variant

7.5

8.5

9.5

10.8

Min Dynamic Pressure

70 kPa 

(0.7 bar)

100 kPa 

(1.0 bar)

Max Dynamic Pressure

500 kPa (5.0 bar)

Max Static Pressure

1000 kPa (10 bar)

Min Static Pressure

50 kPa (0.5 bar)

Max Inlet Temperature

30°C

Min Inlet Temperature

2°C

Inlet Connection

15 mm Compression / Pushfit Coupling

Max Water Hardness

200 ppm CaCO

3

Outlet Connection

1/2” BSP Male

Product

kW

Model Number

Colour

Mira Vie

7.5

J08 GB

White/Chrome

8.5

J08 AB

9.5

J08 BB

10.8

J08 CB

8.5

J08 AC

Chrome

9.5

J08 BC

10.8

J08 CC

Mira Go

8.5

J08 AA

White/Chrome

9.5

J08 BA

10.8

J08 CA

Guarantee

This product has been designed for domestic use only, 

Mira Showers guarantee this product against any defect in 

materials or workmanship for a period of two years from the 

date of purchase (shower fittings for one year).

For terms and conditions, refer to the back cover of this guide.

Domestic

Light Commercial

Heavy Commercial

Healthcare

Recommended Usage

Отзывы: