NOTICE
Welding or lightning strike current lowing through the cell can damage it.
All electrical welding on the weighing system must be inished before mounting the load
cells.
When installing the load cell, immediately bypass the load cell with a lexible copper
strap (included in the load cell equipment).
During any additional electrical welding work near the load cell:
-
Disconnect the load cell cables.
-
Bypass the load cell using the lexible copper strap.
-
Make sure that the grounding clamp of the welding set is itted as closely as possible
to the welding joint.
5.3.2
Installing the mounting kit
Note:
When welding the upper and lower plates, always observe the weld speciications.
Min. thickness of circumferential illet weld: a = 8 mm (a ).
Note:
Screw mounting of the upper and lower plates is described below.
The work steps must be carried out on all support points of the vessel.
Requirements:
-
All threaded holes for the lower plate are available in the foundation/substructure
(see Chapter
).
-
All threaded holes for the upper plate are available in the vessel bracket/vessel foot
(see Chapter
).
SeismicMount PR 6144
5 Installation
EN-14
Minebea Intec