2
Assembly
2.1
Safety instructions
The bottom must be designed as follows:
-
horizontal (spirit level!) supporting/sealing surface
-
lat supporting/sealing surface
-
suicient load carrying capacity for the provided loads
Note:
For further information, see Installation Manual.
WARNING
The vessel may turn over during mounting.
Securing the vessel against tipping is imperative.
Use an appropriate lifting jack.
The following must be observed during installation:
-
Do not lift or transport the load cell via the cable.
-
Avoid shock stress (falling down, hard shocks).
-
The load cell must be installed vertically and centrally in the mounting kit.
-
Load forces must act in the measuring direction of the load cell.
-
The load disc must not be subjected to transverse forces.
-
All contact points between load cell and load disc must be adequately greased.
NOTICE
The bellow and the O-rings are delicate mounting parts.
Do not use sharp-edged tools.
NOTICE
No leak-tightness of the contact surfaces present.
The following contact surfaces must be clean and even to ensure reliable sealing:
between upper plate and vessel foot
between lower plate, adapter plate (if any) and foundation
2 Assembly
Hygienic Weighing Module Contego®
EN-3
Minebea Intec
Содержание Hygienic Weighing Module Contego