Rails
top
view
straight-away rail
18 Rails
completed
connections
connect
bottom
end first
rails to cubes
connect
top end
second
Connect the bottom end of the rail first. It
helps position the cube that connects to the
top of the rail.
rails to rails
Drops
1 cube
Spans
5 cubes
Connect two or more rails
together to create long runs!
Drops
1.5 cubes
Spans
10 cubes
Rail Building Basics
completed
connections
Содержание Q-BA-MAZE 2.0 Colossal Tower
Страница 1: ...Instructions Colossal Tower Ages 6 and up ...
Страница 11: ...x2 clear single exits x2 yellow bottom exits x2 turquoise bottom exits 11 12 x2 clear double exits ...
Страница 16: ...21 22 x1 violet bottom exit x1 magenta bottom exit x1 red double exit ...
Страница 17: ...23 24 x1 blue single exit x1 red bottom exit x1 red single exit x1 blue single exit x1 red single exit ...
Страница 18: ...25 26 x1 red bottom exit x1 red bottom exit x1 blue bottom exit x1 yellow single exit ...
Страница 20: ...29 30 x1 red L exit x1 blue light up x1 turquoise single exit x1 clear speed sproket ...
Страница 22: ...33 34 x2 blue single exits x2 green single exits x1 magenta double exit ...
Страница 23: ...35 36 x1 clear bottom exit x1 blue light up x1 magenta rail x2 teal single exits x2 teal bottom exits ...
Страница 29: ...47 x1 green double exit 48 x1 clear bottom exit ...
Страница 30: ...49 x3 green single exits You did it ...
Страница 31: ......