© 2009 MIMAKI ENGINEERING CO.,LTD.
1.1.2
P.1
R.1.1
Maintenance Manual > Operating Principle > Basic Operation > Sub Switch Power ON
Model CJV30/TPC Issued 2008.08.04 Revised 2008.09.17 F/W ver. 1.20 Remark
1.1
1.1.2 Sub Switch Power ON
Indication on LCD
Processing sequence
Step
Processing
Description
Indication
on LCD
1
Initial setting of CPU and H/W
2
Display at sub switch power ON
1. [PLEASE WAIT] is displayed.
3
Voltage check
1. Check the power supply voltage on the main PCB assy.
• In the malfunction, [ERROR03 POWER **V] is displayed and the
system goes down.
4
FPGA setting
1. Execute the configuration of PDC and HDC.
• In the malfunction, [ERROR09 FPGA ERROR] is displayed and
the system goes down.
• When the fuse F13 of the main PCB assy is blown, the system shuts
down, displaying [EEROR25 47V HEAD VOLTAGE].
5
Version information display
1. Machine model name and main body firmware version are displayed.
2. “Revision” and “PDC/HDC version” are also displayed during the
service mode.
3. Special key function is workable during the version information is
being displayed. (Except firmware update)
6
Initial operation of the printer
"1.1.3 Initial Machine Operation"
.
Display at sub switch power ON
PLEASE WAIT
Version information display
CJV30-100
V1.00
Version information display
(during the service mode)
CJV30-100
V1.00.0
P.1.0.H.1.0
P: PDC, H: HDC
Содержание CJV30 Series
Страница 315: ......
Страница 316: ...Printed in Japan D500387 13 05112010 2010 MIMAKI ENGINEERING CO LTD IT FW 2 5...