background image

OPERATION:

• Connect the supplied 12VDC

power adapter to the meter and
to the mains line.

• Connect the pH-electrode to the

BNC socket on the bottom of
the meter.

• Always remove the electrode

protective cap before taking any
measurement. If the electrode
has been left dry, soak the tip
(bottom 2.5 cm) in M10000B
rinse solution for a few minutes
to reactivate it.

• Make sure that the meter has

been calibrated before taking
any measurements (see Calibra-
tion Procedure).

• Immerse the tip (2.5 cm) of the pH-electrode into the sample.
• Turn the instrument on by pressing the ON/OFF key.
• Allow the reading to stabilize and the meter will start continuous

monitoring.

• A blinking alarm will indicate when the measured pH value is

higher than selected setpoint.

NOTE

: The output power contact (

SMS122

 only) has no protection

fuse inside the meter. It is recommended to  protected it outside,
against failure.

SETPOINT:

• The setpoint can be selected by adjust-

ing the central front knob to the desired
value.

• The selectable range is from 3.5 to 7.5

pH for SMS110; from 5.5 to 9.5 pH for
SMS120 and SMS122.

CALIBRATION PROCEDURE:

• Remove the protective cap from the electrode.
• Immerse the electrode tip into a new sachet of pH 7

calibration solution and allow the reading to stabi-
lize.

• Adjust the OFFSET calibration trimmer (on the front)

to display "7.0 pH".

• Open a new sachet of pH 4 calibration solution and

use a small quantity to rinse the electrode.

• Immerse the electrode tip into the pH 4 sachet and

allow the reading to stabilize.

• Adjust the SLOPE calibration trimmer (on the rear)

to display "4.0 pH".

• The calibration is now complete and the meter is

ready to take measurements.

• It is suggested to recalibrate the meter at least

once a month, after a prolonged stocking time
and after pH-electrode replacement.

INSTALLATION PROCEDURE:
(for SMS122 only)

Отзывы: