
100
Pellerin Milnor Corporation
NOTE:
For instruction: push down travel dimensions and adjustment procedures, see
BNWVUM01
Cross Section: Machine Locked down for
Shipment
Adjustment Complete, Machine Up
Legend
A...
Machine Shell
B...
Remove shipping bolt before running machine. See
instructions for Adjustment of Hold Down
C...
Place extra shims above
D...
Unloaded 3-3/4”
E...
1/2” approx.
F...
2” travel of empty basket
G...
Setting blocks for adjustment. Blocks must hold
shell approximately 3/8” above base pads when ma-
chine is pushed down.
N1..
Be sure shell does not bottom on basepad, there must
be clearance at this point. Check each corner
N2..
Place shims here to adjust ring weldment so that all
four corners seat simultaneously.
Hold Down Adjustment
2 Sheets
6044SR2/SR3, 6044WR2/WR3, 72044SR2/SR3, 72044WR2/WR3
BPWVUJ03 / 2020245
BPWVUJ03.1
0000294996
A.4 A.5
6/11/20 2:02 PM
Released
Содержание 72044SR2
Страница 2: ......
Страница 9: ...1 General Service Safety Related Components Pellerin Milnor Corporation 7 ...
Страница 88: ...86 Pellerin Milnor Corporation Lower Disc Brake Installation 5 Sheets 6044SR2 6044SR3 7244SR2 Drive Assemblies ...
Страница 112: ...110 Pellerin Milnor Corporation 4 Shell Cylinder Door ...
Страница 113: ...This page intentionally blank ...
Страница 128: ...126 Pellerin Milnor Corporation 5 Staph Guard ...
Страница 129: ...This page intentionally blank ...
Страница 135: ...6 Control Sensing Pellerin Milnor Corporation 133 ...
Страница 147: ...7 Chemical Supply Devices Pellerin Milnor Corporation 145 ...
Страница 149: ...This page intentionally blank ...
Страница 157: ...8 Water Steam Pellerin Milnor Corporation 155 ...
Страница 173: ...This page intentionally blank ...