![Miller Big Blue 300 P Скачать руководство пользователя страница 54](http://html1.mh-extra.com/html/miller/big-blue-300-p/big-blue-300-p_owners-manual_1796076054.webp)
OM-4422 Page 50
SECTION 10
−
RUN-IN PROCEDURE
run_in1 8/01
10-1. Wetstacking
Do not perform run-in
procedure at less than 20
volts weld output and do not
exceed duty cycle or equip-
ment damage may occur.
1
Welding Generator
Run diesel engines near rated volt-
age and current during run-in period
to properly seat piston rings and
prevent wetstacking. See name-
plate, rating label, or specifications
section in this manual to find rated
voltage and current.
Do not idle engine longer than
necessary. Piston rings seat
faster if engine runs at weld/
power rpm, and the welding
generator is kept loaded during
run-in.
2
Engine Exhaust Pipe
Wetstacking is unburned fuel and
oil in the exhaust pipe and occurs
during run-in if the engine is run too
long at light load or idle rpm.
If exhaust pipe is coated with a wet,
black, tar-like substance, dry the
engine using one of the following
run-in procedures.
See the engine manual for addition-
al engine run-in information.
2
1
Содержание Big Blue 300 P
Страница 17: ...OM 4422 Page 13 3 2 Manufacturer s Rating Label Ref 216 347 B ...
Страница 40: ...OM 4422 Page 36 8 3 Maintenance Label ...
Страница 52: ...OM 4422 Page 48 SECTION 9 ELECTRICAL DIAGRAMS Figure 9 1 Circuit Diagram For Welding Generator ...
Страница 53: ...OM 4422 Page 49 219 228 B ...