UR75 Quick Start Guide
www.milesight-iot.com
8
3. Hardware Installation
Environmental Requirements
- Power Input: 9-48 VDC (48 VDC is needed for PoE output)
- Power Consumption: ≤ 7.9W (In Non-PoE mode)
- Operating Temperature: -40°C to 70°C (-40°F -158°F)
- Relative Humidity: 0% to 95% (non-condensing) at 25°C/77°F
3.1 SIM Card/Micro SD Card Installation
UR75 do not support hot-plug. Please cut off the power before insert or take off cards.
A. Unscrew the holder of the SIM card.
B. Insert the SIM card(s) into the device following the triangle location of SIM card(s).
C.
Put SIM card into the slot and screw it up.
3.2 Antenna Installation
Rotate the antenna into the antenna connector accordingly.
The external antenna should be installed vertically always on a site with a good signal.
3.4 Router Installation
The router can be placed on a desktop or mounted to a wall or a DIN rail.