![Miles Industries Valor H5 Series Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/miles-industries/valor-h5-series/valor-h5-series_installation-instructions-manual_1795152002.webp)
General Notes Regarding Conversion
The conversion may be done before or after the
appliance is installed into the cavity. However, the gas
must be connected to set the manifold pressure.
Prepare the appliance
1. If the fi replace is already installed, remove the
access side doors, the front trim, the window, and
fuel bed.
Be careful with fuel bed as components
are fragile
.
2. Locate shut off valve and isolate.
3. Remove the ceramic liner panels
4. Remove the burner platform, unscrew the 2
thumbscrews fi xing the front of the burner to the
fi rebox as indicated, also 1 screw at rear of burner.
5. Gently pull up the burner rear fi rst and then the
front.
Be careful not to hook the pilot hood as
you pull the burner up.
Replace the burner injector
1. Using two wrenches disconnect inlet to valve
control.
2. Remove 12 screws holding module plate to fi rebox
base.
3. Withdraw module from fi rebox.
4. Supporting injector elbow, unlock and remove
pipe assembly, remove injector locknut from inside
manifold housing.
5. Exchange injector elbow from kit, verify the new
injector before you install—see
Specifi cations
table
on page 1. Reverse the assembly.
6. Reconnect injector elbow to the pipe. tightening pipe
connection.
Convert the pilot injector
1. Remove the pilot hood by pulling on it.
2. Unscrew the pilot injector using an Allen key.
Discard the pilot injector.
3. Replace with the appropriate pilot injector—see
Specifi cations
table on page 1. Screw in the new
injector.
4. Refi t the pilot head by pushing down on it. Ensure
that it snaps into position.
Remove
pilot cover
(2 screws)
Injector elbow pipe
connection
Fixing points underside
of fi rebox
Rear fi xing screw
2