The machine must be connected to
the water supply by a licensed
plumber in accordance with local
and national regulations. The water
being used should have the drinking
water standards of the respective
country where the machine is used.
– All units and systems used to deliver
the water to the appliance must
conform with the requirements of the
respective country.
– The machine is designed to be
plumbed to a cold water connection.
– The on-site water line must have a
water valve to turn the water off if
needed. If not present, have a water
valve installed by a licensed
plumber.
– The water valve must be accessible
after installation.
– Water pressure on-site:
Minimum: 14.5 psi
Maximum: 145 psi, if higher, install a
pressure reduction valve.
– Suitable 1/4" tubing or copper piping
must be supplied for plumbing.
– To ensure the best ice cube quality,
the maximum length of the tubing or
copper pipe should not exceed 4 ft.
11" (1.5 m). If too much water
remains in the tubing the quality
could be affected.
Connecting to the water
supply
^
Disconnect the machine from the
electrical supply.
^
Remove the cover cap
a
from the
solenoid valve
b
.
^
Install the compression fitting
c
with
the sealing ring
d
on the solenoid
valve
b
.
^
Attach the copper line
e
to the
compression fitting
c
.
^
Secure the copper line to the
appliance using cable clips
f
.
Plumbing (may vary by model)
44
Содержание KFN 8995 SD ED-1
Страница 4: ...Adjustments 48 Changing the door hinging 49 Installing the appliance 56 Contents ...
Страница 57: ...57 ...
Страница 58: ...58 ...
Страница 59: ...59 ...
Страница 60: ...Subject to change without notice 3407 KFN 8995 SD ed 1 KFN 8996 SDE ed 1 M Nr 06 921 010 00 ...