MCAC-PDSM
3.3 Install
Aft
To
av
It
i
he
Ins
Wh
rel
Th
Ou
H
Ins
ins
For ho
Ins
(M
M-2013-04
ling outdo
ter the unit a
ensure the
oid places w
s suggested
elp to low do
stall the unit
hen it is inst
ated local ru
he installatio
utdoor unit h
Horizontal:
side the pac
sallation.
rizontal ins
stall the outd
M6×23 Screw
oor units
arrives, chec
heat disper
with dust, sn
d that user s
wn the noise
far away fro
talled at the
ules.
n direction p
has two meth
ckage of outd
stallation:
door unit sup
ws in access
ck whether i
sion of the u
now, etc. It w
should horizo
e.
om the resid
top of the b
please refers
hods of insta
door unit, th
pporting bar
sories packa
Midea
t is damage
unit, intall th
will block the
ontal intall th
dential area.
uilding, pay
s to the insta
allation: hor
Verti
ere are four
r to ghe unit
age), totally 4
a Precision AC
ed during the
e outdoor un
e condensed
he unit if the
attention to
allation arro
izontal insta
cal
(Top vie
r supporting
first, use 6
4 bars.
Technical Ma
e shipment.
nit at the wil
coils.
e installation
the water p
w label on th
allation and v
w)
:
bars which
screws to fix
anual-Down D
ll-ventilatde
conditions
proof layer a
he outdoor u
vertical insta
are fixed in
x the suppor
elivery Series
45
outdoor,
allow, which
nd obey the
unit.
allation.
horizontal
rting bar
5
h
e