![Midea MSH-21HRN1-QB8 Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/midea/msh-21hrn1-qb8/msh-21hrn1-qb8_service-manual_1790864015.webp)
Service manual
12
7.5 Pumping down (Re-installation)
Procedure
Confirm that both the 2-way and 3-way valves are set to the opened position.
Remove the valve stem caps and confirm that the valve stems are in the opened position.
Be sure to use a hexagonal wrench to operate the valve stems.
Operate the unit for 10 to 15 minutes.
Stop operation and wait for 3 minutes, then connect the charge set to the service port of the 3-way valve.
Connect the charge hose with the push pin to the gas service port.
Air purging of the charge hose.
Open the low-pressure valve on the charge set slightly to purge air from the charge hose.
Set the 2-way valve to the close position.
Operate the air conditioner at the cooling cycle and stop it when the gauge indicates 0.1MPa.
Immediately set the 3-way valve to the closed position.
Do this quickly so that the gauge ends up indicating 0.3 to 0.5Mpa.
Disconnect the charge set, and amount the 2-way and 3-way valve’s stem nuts and service port caps.
Use a torque wrench to tighten the service port cap to a torque of 1.8 kg.m.
Be sure to check for gas leakage.
Содержание MSH-21HRN1-QB8
Страница 10: ...Service manual 7 4 Refrigerant cycle diagram Cooling only Heat pump mode...
Страница 12: ...Service manual 9 6 Wiring diagram Indoor Outdoor...
Страница 22: ...Service manual 19...