5
INSTALLATION
WALL DRILLING AND BRACKET FIXING
As the first step, proceed with the following drawings:
●
A vertical line up to the ceiling or up to the upper limit, at the center of the area in which the
hood is to be fitted.
●
A horizontal line
A
at
970 – 1070
mm above the cooker top.
●
A horizontal line
B
at X mm above the horizontal line
A
.
●
A horizontal line
C
at
288
mm below the horizontal line
A
.
Mark points:
●
Mark a point
(1)
on the horizontal line
A, 80
mm to the vertical reference line.
●
Repeat this operation on the other side and on the vertical reference line, checking that the
three marks are on one horizontal line.
●
Mark a point
(2)
on the horizontal line
B, 60
mm to the right of the vertical reference line.
●
Repeat this operation on the other side, checking that the two marks are on one horizontal line.
●
Mark a point
(3)
on the horizontal line
C, 80
mm to the right of the vertical reference line
(solution2)
.
●
Repeat this operation on the other side, checking that the two marks are on one horizontal line.
Fix the brackets:
●
Drill at the marked points
(1), (2), (3) (solution 2)
, using a ɸ10 mm drill bit.
● Insert the wall plugs 11 into the holes
(1), (2), (3) (solution 2)
.
● Fix the hood fixing bracket
20
with 3 screws
10
(5 x 50)
at the horizontal line A,
● Fix the chimney fixing bracket
21
with 2 screws
10
(5 x 50
)
at the horizontal line C.
Option Chimney
X
1
400X400
155-500
Содержание MHT60BL
Страница 4: ...4 DIMENSION Chimney A B 1 400 400 448 485 838...
Страница 11: ......