INSTALLATION
WALL DRILLING AND BRACKET FIXING
As a first step, proceed with the following drawings:
A vertical line up to the ceiling or up to the upper limit, at the center of the area in which the
hood is to be fitted.
A horizontal line
A
at
1320 – 1700
mm above the cooker top.
A horizontal line
B
at a minimum
926
mm above the cooker top.
A horizontal line
C
at a minimum
730 (910 optional)
mm above the cooker top.
Mark Points:
Mark a point
(1)
on the horizontal line
A
,
60
mm to
the vertical reference line.
Repeat this operation on the other side, checking that the two marks are leveled.
Mark a point
(2)
on the horizontal line
B
,
80
mm to
the vertical
reference line.
Repeat this operation on the other side and on the vertical reference line, checking that the
three marks are leveled.
Optional
12
21
11
11
10
10
20
10
11
80
130
130
250
250
80
60
60
530
730
910
1320 - 1700
926
A
B
C
(OPTIONAL)
C
(1)
(2)
(3)
Vertical reference line
5
Содержание MHC90CGSS
Страница 12: ...P N 19173000A09197...