12
SECTION 2 – INSTALLATION
A. Inspect for shipping Damage
All shipping container should be examined for
damage before and during unloading. This
equipment was carefully inspected and
packaged at the factory. The freight carrier has
assumed responsibility for its safe transit and
delivery.
If equipment is received in damaged
condition, either apparent or concealed, a
claim must be made with the delivering
carrier.
1. Apparent Damage or Loss- If damage or loss is
apparent it must be noted on the freight bill or
express receipt at the time of delivery, and it
must be signed by the carrier’s agent (driver). If
this is not done, the carrier may refuse the claim.
The carrier will supply the necessary claim
forms.
2. Concealed Damage or Loss- If damage or loss
is not apparent until after equipment is uncrated,
a request for inspection of concealed damage
must be made with carrier within 10 days. The
carrier will make an inspection and will supply
necessary claim forms. Be certain to retain all
contents plus external and internal
packaging/crating materials for inspection.
B. Placement of Oven
Some very important considerations must be
made when choosing the place where the oven
is to operate.
1. This oven is conveyorized and operates
continuously. It should be placed so it fits into
the “flow” of the operation.
2. Drafts entering the oven chambers can cause
inconsistent cooking results. Check the area
surrounding the oven and eliminate sources of
drafts such as open windows or doors and fans
or other appliances that cause air circulation.
3. Oven should be positioned so hot air from
another piece of equipment cannot enter the
oven cooling fan air intake on the oven front.
Serious problems could occur.
NOTE: To validate a new oven(s) warranty, an
authorized CTX installer must supervise Steps C
through H of installation.
C. Items for Stacking Oven
The following items are required for stacking
ovens:
Quantity
Description
2
4”x4”x4’ (10.2cm x 10.2cm x 61cm)
board
2
4”x4”x2’ (10.2cm x 10.2cm x 122cm)
board (stacking ovens only)
2
1-1/2”x7’ (3.8cm x 213cm) rigid pipe
Schedule 40
2
Custom M5 Lift (Vermette)
D. Base Section Assembly
1. Locate the carton containing the oven base.
Remove and inventory the contents. Refer to the
correct parts lists below and also to Figure 2-1
2. Lay weldment base (Item 4, Figure 2-1) upside
down on the floor and remove the protective film
from base. Attach the four Assy. Leg, Caster
(Item 5) using 16 SCR, Cap HX HD 3/8”-16X1”
NP (Item 10), 16 Washer, Flat SS 3/8” (Item 9),
and 16 Washer, Lock Split 3/8” ZP (Item 8). For
Quad screw casters directly into basepad.
3. Turn the base assembly upright and set aside.
Also set aside 4 SCR, SL Truss HD SS 10-
32X1-1/2” (Item 7), and Panel, Top (Item 5). The
base will be used to stack oven on, and the top
secures to the top of the oven top oven.
Содержание CTX GEMINI Series
Страница 46: ...46 Single Belt Conveyor through April 2017 28 8 69776 Extension Tray not shown ...
Страница 47: ...47 Single Belt Conveyor Beginning April 2017 ...
Страница 48: ...48 Split Belt Conveyor through April 2017 28 8 69776 Extension Tray not ...
Страница 49: ...49 Split Belt Conveyor Beginning April 2017 ...
Страница 50: ...50 Hearth Belt Conveyor through June 2017 ...
Страница 51: ...51 Hearth Belt Conveyor beginning June 2017 ...
Страница 52: ...52 SECTION 7 SCHEMATICS A DZ33I EMS AND Hi Temp Voltage and Amperage Schedule ...
Страница 53: ...53 B DZ33I 208 240V 3Ph Schematic ...
Страница 54: ...54 C DZ33I 208 240V 3 Phase to 1 Phase Conversion ...
Страница 55: ...55 D DZ33I 380 416V 3 Ph Schematic ...
Страница 56: ...56 E DZ33I 230V CE 3 Ph Schematic ...
Страница 57: ...57 F DZ33I 380V CE 3 Ph Schematic ...
Страница 58: ...58 Notes ...