
INSTALLATION AND OPERATION MANUAL, SELF-GENERATING STEAM FULL JACKETED
TILTING FLOOR MOUNTED KETTLES, MODELS ELT-20F, ELT-30F, ELT-40F, ELT-60F
6.0 GENERAL MAINTENANCE
No general maintenance is required other than adhering to the Cleaning Procedure instructions.
SAFETY VALVE MAINTENANCE AND TESTING
CAUTION! Under normal operating conditions a “try lever test”
should be performed every two months. Under severe service
conditions, or if corrosion and/or deposits are noticed within the
valve body, testing must be performed more often. A “try lever test”
should also be performed at the end of any non-service period.
CAUTION! Hot, high pressure fluid may be discharged from body
drain and vent during “try lever” test. Care must be taken to avoid
any bodily contact.
CAUTION! High sound levels may be experienced during “try lever”
test. Wear proper safety equipment and exercise extreme care!
Test at, or near, half of the operating pressure by holding the test
lever fully open for at least two seconds to flush the valve seat free
of sediment and debris. Then release lever and permit the valve to
snap shut.
If lift lever does not activate, or there is no evidence of discharge,
turn off equipment immediately and contact a licensed contractor or
qualified service personnel.
WARNING: At least twice a year have an authorized service person clean and
service the unit for maximum performance.
Part No. 10170R3
15
2018-07-19