SECTION 2
INSTALLATION
18
Gas Piping Requirements
ITEM NO.
DESCRIPTION
Nat Gas
LP
1
GAS SUPPLY PIPE
2"
2"
2
TEE
2" x 1-1/4"
2" x 1-1/4"
3
DRIP LEG
2"
2"
4
CAP
2"
2"
5
NIPPLE
1-1/4"
1-1/4"
6
FULL-FLOW SHUTOFF VALVE
1-1/4"
1-1/4"
7
NIPPLE
1-1/4"
1-1/4"
8
1-1/4" REGULATOR DYNAMIC READING
8"-12" W.C.
8"-12" W.C.
**9
OVEN HOSE (PS770)
1-1/4"
1-1/4"
10
TEE 1-1/2" x 1-1/2" x 1/2"
1-1/2" x 1-1/2" x 1/2"
1-1/2" x 1-1/2" x 1/2"
11
REDUCING BUSHING 1/2" x 1/4"
1/2" x 1/4"
1/2" x 1/4"
12
GAS SUPPLY PIPE
2-1/2"
2-1/2"
13
REDUCING BUSHING 1-1/4" x 2-1/2"
1-1/4" x 2-1/2"
1-1/4" x 2-1/2"
METER
DUAL
AL-800
TRIPLE
AL-1200
Supplied by Middleby (all other parts supplied by customer)
Piping length – maximum 200' (61m)
2 PSI systems use the same components, except the meter size may be an AL-630 for double stack applications, unless otherwise approved by
Middleby engineering.
GAS SUPPLY
The following gas system specifications are
STRONGLY RECOMMENDED. Deviating from these
recommendations may affect the baking performance
of the oven.
Gas Meter
•
One or two cavities: 750 cfh meter
•
Three oven cavities: 1200 cfh meter
Gas Line
DEDICATED LINE from the gas meter to the oven
•
2" (50.8mm) pipe for natural gas
•
2" (50.8mm) pipe for propane
•
Maximum length: 200' (61m). Each 90° elbow
equals 7' (2.13m) of pipe.
Check the oven’s gas supply requirements before
making the gas utility connection. Gas supply
requirement are listed on the oven’s serial plate and in
X70G/X55G Series Specifications in Section 1.
Check the serial plate to determine the type of gas
(Propane or Natural) to be used with the oven. See
Gas Conversion under Gas Connection for converting
oven to propane.
NOTICE
Where national or local codes require the installation
of fire suppression equipment or other supplementary
equipment, DO NOT mount the equipment directly to
the oven.
Mounting such equipment may:
•
Void agency certifications
•
Restrict service access
•
Lead to increased service expenses for the owner
Содержание X55G Series
Страница 8: ...SECTION 1 DESCRIPTION 8 NOTES...
Страница 26: ...SECTION 2 INSTALLATION 26 Gas Train and Burner Assembly...
Страница 37: ...SECTION 4 MAINTENANCE 37...
Страница 38: ...SECTION 4 MAINTENANCE 38 NOTES...
Страница 42: ...SECTION 6 ELECTRICAL SCHEMATICS 42...
Страница 43: ...SECTION 6 ELECTRICAL SCHEMATICS 43 Wiring Diagram G208 240 AC 50 60 Hz X55 77605 REV B...
Страница 44: ...SECTION 6 ELECTRICAL SCHEMATICS 44...
Страница 45: ...SECTION 6 ELECTRICAL SCHEMATICS 45 NOTES...